Laserfiche WebLink
by the DEQ. Revenues to support the anticipated capital project needs will be derived from user rates <br />and systems development charges. In order to mitigate potentially significant short-term impacts to user <br />rates, a significant amount of debt financing will be necessary. The MWMC Financial Plan, adopted in <br />2003, anticipates this need and provides financial policies and tools which will serve the commission in <br />managing the revenue requirements over the coming years to minimize overall costs and user rate <br />increases. (User rates have not yet been finalized, but the anticipated total increase for a typical <br />residence over the first five years would range from approximately $5.60 to $6.50 per month.) SDC <br />rates will increase by approximately 79% to support growth's equitable share of necessary capital <br />improvements. <br /> <br />Other Background Information <br />The Facilities Plan is the culmination of a year-long effort involving significant public review. Facility <br />planning analyses conducted by CH2M HILL began in March 2003, with the oversight of a 12-member <br />Eugene-Springfield staff steering committee. The commission reviewed the draft Facilities Plan in a <br />special, publicly advertised evening workshop on November 24, 2003, and gave consensus instruction to <br />finalize the 20-Year Project List to include the recommended preferred solutions and new disinfection <br />system. On January 8, 2004, the commission, after another review of the draft Facilities Plan and <br />associated costs, gave direction to proceed with the finalization of the 20-Year Project List. A third <br />public open house was advertised and held the evening of March 3, 2004. The commission held a public <br />hearing on adoption of the Facilities Plan and 20-Year Project List on April 22, 2004, and carried over <br />the hearing to May 6, 2004, to allow time for additional public review and testimony. <br /> <br />Except for the original 1977 "208 Plan," MWMC has not until this time updated the formal Facility Plan <br />to be approved by the DEQ. An approved Facilities Plan will incorporate the existing adopted plans (the <br />WWFMP and the Biosolids Management Plan), contain updated technical analyses and projections of <br />flows and loads, provide reasonable assurance of compliance with state and federal regulations and new <br />limitations and requirements in the NPDES permit (see next paragraph), and revise the capital <br />improvement projects to meet the needs for adequate operational facilities. Having a formally approved <br />Facilities Plans will also make MWMC eligible for public loans and grants. <br /> <br />As stated, the Facilities Plan will help to ensure continued compliance with regulatory requirements that <br />govern the quality of effluent discharged from the treatment works as well as conditions for the <br />collection and transmission ofwastewater to the treatment plant. These regulations present legal <br />requirements for the provision ofwastewater services to the community and form the foundation for the <br />design criteria used in formulating the Facilities Plan and associated 20-Year Project List. The DEQ <br />reissued MWMC's National Pollutant Discharge Elimination System (NPDES) permit in May, 2002, <br />which prompted the commission to pursue a thorough, updated Facilities Plan to include the new <br />ammonia and thermal load limits of the renewed permit, as well as the new requirements to implement a <br />Temperature Management Plan (TMP) and the WWFMP. Furthermore, a comprehensive analysis of the <br />treatment plant's processes and hydraulic capacities has led the commission to include an evaluation and <br />recommendation of alternative disinfection systems to mitigate worker safety and community risk <br />concerns in the Facilities Plan. <br /> <br />The treatment plant also currently faces a significant peak flow capacity deficit, which was projected in <br />the earlier WWFMP and has been validated and updated to the year 2025 based on an updated modeling <br />using more recent 2003-04 data. The present facility effort is prompted by the original <br />intergovernmental agreement which specified that when the sewage loading into the treatment plant <br /> <br /> L:\CMO\2004 Council Agendas\M040519\S040519A. doc <br /> <br /> <br />