My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. ENVIRONMENTAL REPOFrr <br /> <br />To provide a basis for comparison to System Alternative I and System Alternative 4, the <br />features that would be added to the WPCF and the wastewater treatment process are <br />described below. An analysis of the types of potential environmental impacts .under <br />MWMC's preferred alternative are presented in sections 9.4.2 through 9.4.10. <br /> <br />Water Pollution Control Facility <br />Under the parallel primary/secondary treatment alternative (PP/ST), the peak wet weather <br />flow capacity of the WPCF would increase from approximately 160 mgd to 300 mgd. All <br />wastewater entering the plant would receive preliminary treatment (grit removal, etc.). <br />Additionally, a new tertiary treatment system would be added with capacity to treat 30 mgd <br />of secondary-treated wastewater. Under this alternative, wastewater treatment would vary <br />depending on plant influent flows, as follows. <br /> <br /> 0-137 mgd: Total influent flows to the plant of 0-137 mgd would undergo the same series <br /> of treatment processes currently used to treat plant flows: preliminary screening <br /> followed by primary treatment, secondary treatment, and disinfection prior to <br /> discharge. <br /> <br />· 137-160 mgd: With plant influent flows of 137-160 mgd, preliminary-treated wastewater <br /> (0-23 mgd) would bypass primary treatment and go directly to secondary treatment. <br /> <br />· 160-300 mgd: When plant influent flows totaled 160-300 mgd, 23 mgd would bypass <br /> primary treatment and go directly to secondary treatment, as described above. The rest <br /> of the flow above 160 mgd (0-140 mgd) would undergo primary treatment and bypass <br /> secondary treatment, heading to high-rate disinfection. <br /> <br />Table 9.4.1-1 describes how the influent would be routed under this project alternative. <br /> <br />TABLE 9.4.1-1 <br />Parallel Primary and Secondary Treatment FI0w Strategy <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Plant Total Flow Through Preliminary Treated Primary Treated Primary Treated Effluent <br /> Influent Secondary Effluent to Secondary Effluent to Secondary Diverted Around <br /> Flow (mgd) Treatment Treatment Treatment Secondary Treatment <br /> <br /> 0-137 0 increasing to 137 0 0 increasing to 137 0 <br /> 137-160 137 increasing to 160 0 increasing lo 23 137 0 <br /> 160-297 160 23 increasing to 160 137 decreasing to 0 0 increasing to 137 <br /> 297-300 160 160 0 137 increasing to 140 <br /> <br />The diverted primary effluent and secondary treated effluent would be disinfected in <br />separate flow streams and blended together prior to being discharged into the Willamette <br />River. <br /> <br />Implementing PP/ST at the WPCF would involve constructing the following features <br />(Figure 9.4.1-1): <br /> <br />· Pretreatment expansion <br /> <br />MWMC_9.0_REV14.DOC 9-9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.