My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />3.1.3 Conveyance Pump Station History <br />For the regional facility to begin operation in 1984, wastewater flows from the Eugene- <br />Springfield metropolitan area needed to be consolidated. New sewers were also constructed <br />throughout the unincorporated River Road/Santa Clara area. This resulted in a number of <br />newly constructed regional and local conveyance pump stations. In addition, upgrades to <br />selected existing pump stations that once served the separate Eugene and Springfield <br />treatment facilities were required so they could continue to operate and serve the new <br />regional facility. Most of the original planning and design for these conveyance pump <br />stations took place from 1979 to 1983. The majority of the construction for the major <br />conveyance pump station facilities took place between 1983 and 1987. Table 3.1.3-1 <br />summarizes the construction of new conveyance pump stations and the modifications to <br />existing pump stations required as part of the original construction that would serve the <br />new regional facility. <br /> <br />TABLE 3.1.3-1 <br />Original Major Conveyance Pump Stations <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Construction Project Year Description of Construction or Modification <br /> <br />West Irwin Pump Station 1983 Regionally owned station serving the Bethel section of Eugene. <br /> West Irwin pump station ownership should change to the City of <br /> Eugene in 2005. Original pump station constructed in 1965. <br /> Expanded in 1983 as part of the regional facility. Added force <br /> main to pump raw sewage from 2525 West Irwin Street lo the <br /> WPCF <br /> <br />Willakenzie Pump Station 1984 Regionally owned station serving the area east of the Willamette <br /> River. Expanded in 1984 as part of the regional facility. Pumps <br /> raw sewage from 3050 Goodpasture Lakes Loop, east of the <br /> Willamette River, via force main directly to the WPCF <br /> <br />Terry Street Pump Station 1985 Regionally owned station serving the southwestern area of <br /> Eugene. Terry Street pump station ownership should change to <br /> the City of Eugene in 2005. Pumps raw sewage from 5t90 Barger <br /> Drive via force main to West Irwin Pump Station <br /> <br />Division Pump Station 1985 Locally owned station serving the Santa Clara Square and area <br /> north of the Beltline Highway. Pumps raw sewage from 203 <br /> Division Avenue and discharges into either the Terry Street or <br /> West Irwin force mains <br /> <br />Skipper Pump Station 1986 Locally owned station serving the area south of the Beltline <br /> Highway. Pumps raw sewage from 1195 Skipper Avenue and <br /> discharges into the Terry/West/Irwin/Irvington Valve Array Vault <br /> <br />Greenwich Pump Station 1987 Locally owned station serving the area west of River Road to <br /> Northwest Expressway. Pumps raw sewage from 811 Greenwich <br /> Avenue end discharges into the Irvington force main <br /> <br />Irvington Pump Station 1987 Regionally owned station serving lhe Santa Clara area and the <br /> Biosolids Management Facility. Pumps raw sewage from 1248 <br /> Irvington Drive to the Terry/West/Irwin/Irvington Valve Array Vault <br /> via force main. <br /> <br />3-2 MWMC 3.0 REV11.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.