My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3~ EXISTING WASTEWATER FACILITIES <br /> <br />TABLE 3.2.2-1 <br />WPCF Pretreatment Facility Unit Processes and Equipment <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Capacity, (each/total <br /> Equipment Type Quantity firma/totalb) <br /> <br />Screenings Grinder Inline (rated at 150 cubic feet of screenings 2 1,000/1,000/2,000 gpm <br /> per hour) <br /> <br />Grit Removal Aerated Grit Chambers (101,000 gallons 4 58.3/175/233 mgd <br /> each; design criteria of 2.5 minutes <br /> detention time at peak flow) <br /> <br />Grit Slurry Pumps Recessed Impeller 4 300/900/1,200 gpm <br /> <br />Preaeration Chambers (152,000 gallons each; design 4 14.6/43.8/58.4 mgd <br /> criteria of 15 minutes detention time at <br /> average flow) <br /> <br />Screenings Impeller Washer 2 2,000/2,000/4,000 gpm <br />Washer/Compactor Shafted Screw Conveyor and Compactor <br /> <br />Compacted Shaftless, Dual-Drive, Reversing <br />Screenings/Grit Grit 2 900/900/1,800 lb/hr <br />Conveyor Screenings 2 1,400/1,400/2,800 lb/hr <br /> <br />Solids Loadout Conveyor Shaftless Screw <br /> Grit 2 900/900/1,800 lb/hr <br /> Screenings 2 1,400/1,400/2,800 lb/hr <br /> <br />Grit Separation Cyclones 4 300/900/1,200 gpm <br /> Classifiers 2 600/600/1,200 gpm <br /> <br />Notes: <br />a Total firm capacity is with largest unit out-of-service. <br />b Total capacity is with all units in service. <br /> <br />Primary Treatment <br />The MWMC WPCF currently uses a total of four primary clarifiers to treat screened and <br />degritted raw sewage. The existing primary clarifiers are circular, have outboard launders, <br />and are 135 feet in diameter. Each clarifier receives effluent from the plant's existing <br />headworks through a dedicated 60-inch-diameter pipe. Primary sludge is accumulated at <br />the bottom of the clarifier and thickened through compaction. Primary sludge solids are <br />drawn off with intermittent sludge pumping and a thin sludge blanket is maintained within <br />the clarifier. Table 3.2.2-2 summarizes the primary treatment processes and equipment. <br /> <br />MWMC_3.0_REV11.DOC 3-9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.