Laserfiche WebLink
partial containment of runoff on-site. <br /> <br /> Multi-family Residential, Commercial, Industrial, other development using a <br /> common or shared facility: <br /> <br /> The stormwater SDC will be reduced in the same proportion that the <br /> mitigating facility reduces runoff leaving the fully developed site. <br /> <br /> 7,2 Credits <br /> <br /> City approval of credits shall be given based on one or more of the following: <br /> <br /> ?.2,1 Qualified Public Improvement Credit <br /> <br /> For any qualified public improvement (as defined in Eugene Code) to be <br /> constructed in connection with the development for which an SDC is collected. <br /> <br /> ?,2,2 Capital Improvement Credit <br /> <br /> For any capital improvement (as defined in Eugene Code) to be constructed as part <br /> of a development to the extent: <br /> <br /> that it reduces the need for construction of specific, identifiable public <br /> improvements; or <br /> <br /> that it would otherwise have to be constructed or acquired at public <br /> expense and is eligible for funding with Systems Development Charge <br /> funds under the current policies of the City Council; or <br /> <br /> that the City can recover credits through collection of an equivalent <br /> assessment from benefited properties, or for which the City Council has <br /> formed a Local Improvement District in accordance with provisions in <br /> Eugene Code, 1971 section 6.610 (6) or 7.407 (3). <br /> <br /> 7.2.3 Previous Payment or Use <br /> <br /> SDC fees paid are not refundable and, in the case of an agreement to pay SDCs in <br /> installments, the terms of the agreement may not be modified. A partial refund of <br /> SDC fees will be made or a modification of an installment agreement will be <br /> allowed when an active development permit is canceled or expires without being <br /> used, a change of design of an active development permit is approved that results <br /> in a less intense use of the property, or property previously developed as a <br /> manufactured home park is partitioned and redeveloped. No portion of the <br /> <br /> administrative fees will be refunded, and an additional administrative charge may <br /> be imposed to cover the cost of calculating and processing the partial refund. <br /> <br /> Credits for other types of previous payment or use may, however, be provided. In <br /> calculating the credits given under this section, the City Engineer shall apply credit <br /> for previous payment or use only to developments (e.g. structure, impervious area) <br /> <br />City of Eugene SDC Methodologies <br /> <br /> <br />