Laserfiche WebLink
TABLE 6 <br /> <br />Local Wastewater System Development Charge Analysis <br />1. Analysis of System Value <br />Total Replacement Cost - Pipe $415,212,336 <br />Total Replacement Cost - Pumping Stations $15,850,693 <br />City Cost of future projects within UGB $9,925,332 <br />Other Wastewater Components $3,253,455 <br />2. Analysis of Assessable Amount <br />Size Total Cost <br />6-inch $9,434,085 <br />8 to 48-inch $313,928,688 <br />131~ ~p~city I ~°~ati°n ~.~ ~ <br /> ~ Calculation of Wastewater SDC <br />~ot~~~u~~~ned ~44,241,81611 <br />lCost ~er unit of capaci~ per ~allon I $2.2572 <br />5. Calculation of Reimbursement Percentage <br /> <br /> City System Capacity (EDUs) in mgd 49.0 100.00% <br /> Existin~ Use in m9d 21.4 43.7% <br /> Percent Available for New Development in mgd 27.6 56.3% <br /> <br /> Total Value of Resewe Capacit~ (value of s~stem) $62,122,254 100.00% <br /> <br /> City of Eugene SDC Methodologies Wastewater, <br /> <br /> <br />