My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B-MWMC Proposed SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item B-MWMC Proposed SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:17:42 PM
Creation date
5/12/2004 3:16:14 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />TABLE 3 <br />Summary of Facility Process Component Allocation to System Capacity Parameters <br /> <br /> System Capacity Parameter <br /> <br /> Average Peak <br /> Facility Process Component Flow Flow BOD TSS Indirect Total <br /> <br />Collection system pipeline ¼ % ...... 1 <br />Collection system pump stations ¼ % ...... 1 <br />Preliminary treatment ¼ % ...... 1 <br />Primary treatment ¼ -- ¼ Y2 -- 1 <br />Secondary treatment ¼ -- Y2 ¼ -- 1 <br />Disinfection/ouffall ¼ 3/. ...... 1 <br />Biosolids (same for all three subcomponents) .... Y2 Y~ -- 1 <br />Tertiary filters ¼ -- ¼ Y2 -- 1 <br />Reuse facilities 1 ........ 1 <br />Odor control .... ¼ Y~ -- 1 <br /> '1 <br />Peak flow management - I ...... <br /> <br />Support facilities (Indirects) ........ 1 I <br /> <br /> Step Two. Growth Capacity Requirements <br /> In developing SDCs, costs related to growth (see 'Cost Basis' below) are spread over <br /> growth's total capacity requirements over the study period to determine the overall cost per <br /> unit of growth by capacity measure. The study period is defined as a 20-year period, <br /> consistent with facility planning requirements. The Department of Environmental Quality <br /> (DEQ) stipulates that entities that own and operate wastewater facilities assume a 20-year <br /> planning horizon when developing facility plans (see DEQ Guidance for Development of <br /> Wastewater Facilities Plans, 2000). <br /> <br /> To determine the capacity required by growth, the capacity required by existing users is <br /> subtracted from the capacity projected in the facility plan to be required at the end of the <br /> planning period. For peak flow estimates, existing users' current capacity requirements are <br /> adjusted for anticipated I/I reductions (see Guidelines for the Preparation of Facilities Plans <br /> and Environmental Reports for Community Wastewater Projects, 1999). <br /> <br /> Methodology Element Two: Develop Cost Basis <br /> The cost basis represents the total costs that the SDCs are intended to recover. The following <br /> methodological issues were addressed in developing the reimbursement and improvement <br /> fee cost bases: <br /> <br /> · System Valuation (Reimbursement Fee) -The method for valuing existing facilities <br /> with capacity to serve growth. <br /> <br /> · Existing System Allocation (Reimbursement Fee)- The method for allocating existing <br /> system facility value to growth. <br /> <br /> S EA31003271388(DG). DOC/041040034 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.