My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B-MWMC Proposed SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item B-MWMC Proposed SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:17:42 PM
Creation date
5/12/2004 3:16:14 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />The allocation fractions from Table 3 are used to distribute costs by facility component to <br />capacity parameter, as was done for the existing system cost allocations. The basis for these <br />allocations is described in Appendix B. <br /> <br />Step I-3 of the project cost allocation methodology is to allocate costs to project types. The <br />three project types, which are intended to be representative of the complete project list, are: <br /> <br />1. Capacity-Projects or portions of projects that are related to increasing liquids and/or <br /> biosolids conveyance, treatment, and disposition capacity beyond existing design <br /> standards (i.e., projects that provide the next capacity increment within the planning <br /> period). <br /> <br />2. Performance Improvements-Projects that increase system capacity by increasing the <br /> level of performance provided by facilities. Unlike 'capacity' projects that relate only to <br /> the next increment of capacity, performance upgrades are generally sized based on total <br /> projected capacity needs at the end of the planning period (existing and future). <br /> <br />3. Rehabilitation- Projects designed to remedy an existing system deficiency and do not <br /> enhance system capacity. <br /> <br /> Capacity and performance upgrade projects can be new facilities, or upgrade/expansion of <br /> existing facilities. Rehabilitation projects are the replacement of outdated or worn out <br /> equipment or facilities. <br /> <br /> The majority of the projects will typically fall completely into one project type. However, <br /> some projects may be split between capacity and performance types. The general criteria for <br /> allocating projects to the above categories are shown in Table 5. These criteria should be <br /> applied in the development of specific projects for inclusion in the appropriate planning . <br /> document or project list and should be considered and evaluated as part of the process of <br /> adoption of such a plan or project list. <br /> <br /> TABLE 5 <br /> Summary of Project Type Allocation Criteria <br /> <br /> Project Type Potential Criteria <br /> <br /> Capacity Adds new facilities/expands existing facilities <br /> <br /> Provides new liquids treatment or biosolids capacity beyond existing <br /> system design standard or beyond the current permitted capacity <br /> Performance Improvements Adds new facilities/improves existing facilities <br /> Provides capacity/enhanced capability sized for total future capacity <br /> needs <br /> <br /> Driven by new regulatory requirement <br /> Driven by increase in community performance standard <br /> Technological efficiencies <br /> Rehabilitation Replaces existing facility or portion of facility <br /> Does not serve growth either through existing available or new <br /> capacity <br /> Preserves existing facility performance/capacity <br /> <br /> SEA31003271388(DG).OOC/041040034 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.