My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B-MWMC Proposed SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item B-MWMC Proposed SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:17:42 PM
Creation date
5/12/2004 3:16:14 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix F <br /> <br /> · ="",,,. ,..,.e"k'~'~"~".,,,...,, ,...d i~al Formulas ~",G Fat e <br /> <br />1.0 Formula and Calculation Details <br /> 1.1 General Rate Setting, Cost of Service Formula <br /> <br /> SDC eligible costs <br /> = SDC per unit of service <br /> Impact measurement <br /> <br /> 1.2 Transportation System Cost of Service consists of non-assessable arterial <br /> and collector street system cost of service plus off-street bicycle cost of service. <br /> <br /> 1.2.1 Non-Assessable Arterial & Collector Street System Cost of Service <br /> General Formula <br /> <br /> I Non-Assessable Cost Lane Mile X Lane Miles trip = Cost trip <br /> per <br /> per <br /> per <br /> Calculation <br /> <br /> Street System Cost per Trip <br /> <br /> Reimbursement: $851,355 X (0.8888/675) = $1,121.01 = Cost per Trip <br /> Improvement: $1,013,386 X (0.8888/675) = $1,334.37 = Cost per Trip <br /> Total Allocated Cost per Trip -- $1,121.01 (0.4) + $1,334.37 (0.6) = $1,363.66 <br /> <br />City of Eugene SDC Methodologies F Schedule & Formulas, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.