Laserfiche WebLink
and such other factors as the engineer deems relevant. <br />~ 3 } Upon reasonable notice under the circumstance, i f the per- <br />mi ttee fai ] s to restore and maintain the public way affected by its work, <br />the city may perform the work and charge the cost to the permi ttee. <br />l .309 Pub1 i c way Construction and Use - Cut vent I ns to l l ati ons , T f the <br />permit ~s for ~nsta at~on a a culvert or access to property, <br />the culvert must be installed i n the size designated by the city engineer <br />and i n compliance with the requirements of subsection 1.290 (3 } . All cut vents <br />are considered temporary and may be removed at any time as provided in sec- <br />ti on 7.302. <br />1.340 Television Cable Trenching. <br />or new constructs on or property development where the city <br />requires that television cable be placed underground, the developer of the <br />property sha11 give the local general manager or systems engineer of the <br />cable franchise hot der at 1 east 30 days written notice of such construction <br />or development. The notice sha11 include a cagy of any final plat, the par- <br />ti cular date on which open trenching will be avai 1ab1 e for the cable fran- <br />chi se hot der' s instal 1 ati on of conduit, pedestals andlor vaults, and lateral s <br />to be provided at the cable holder's expense, Trenching within the publ i c <br />way shal 1 conform to sections 7.290 to 7.305 of this code . <br />~ 2 } Notice of trench avai 1 obi 1 i ty shall be given by certified <br />mail , or other method which establishes the time of receipt by the cabl e <br />franchise hot der. Costs of trenching and easements required to bring ser- <br />vice to the development sha11 be borne by the developer. If the cable fran- <br />chi se hot der fai 1 s to instal 1 its conduit, pedestals andlor vaults, and <br />1 ateral s within two ~ 2 } working days of the date the trenches are avai 1 abl e <br />as designated i n the notice, and the trenches are subsequently closed after <br />the two~day period, the cost of new trenching shat 1 be borne by the cabl e <br />franchise holder. <br />~ 3 } ~ f the developer fai 1 s to provide the trench for the tel e- <br />vi si on cable and the required notice to the cable franchise holder, the city <br />engineer may cause the trench to be provided either with city forces or by <br />private contract, and sha11 give the cable franchise holder 30 days written <br />notice of the date the trench will be avai 1 ab1 a for instal 1 ati an of conduit, <br />pedestals andlor vaults, and laterals. <br />~4 } I f the trench i s provided through use of city forces, the <br />developer shal 1 be charged the amount of actual cost, as established by the <br />city engineer. This shal 1 consist of the basic costs of the work, including <br />supervision, and whatever additional costs any extraordinary aspect of the <br />the work entails. <br />~5} ~f the trenching is necessitated under subsection ~3} above <br />and the work is performed under a private contract, the develo er sha11 be <br />p <br />charged the amount actually paid to the contractor, plus a charge for super- <br />vi si on as established by the city manager. <br />~5} The finance officer may collect the amount of any charges <br />from the developer or cause the charge to be assessed against the property, <br />and subject to the 1~en and foreclosure procedures prescribed in sections <br />2, 540 to 2.547 of this code. <br />~l} In the event the cable franchise holder fails to install its <br />conduit, pedestals andlor vaults, and 1 ateral s within two ~ 2 } working days <br />Ordinance - 40 <br />