My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Adoption of Resolution 4964 on SDCs
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 02/23/09 Meeting
>
Item 2C: Adoption of Resolution 4964 on SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:32:00 PM
Creation date
2/20/2009 10:34:37 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. _____ <br />A RESOLUTION ADOPTING INFLATIONARY ADJUSTMENTS OF <br />SYSTEMS DEVELOPMENT CHARGES FOR PARKS SYSTEM, AND <br />LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND <br />TRANSPORTATION SYSTEM; SUPERSEDING ADMINISTRATIVE <br />ORDER 58-08-02-F; AND AMENDING RESOLUTION NO. 4900. <br /> The City Council of the City of Eugene finds as follows: <br />A. <br /> The System Development Charges (SDC) Methodologies were adopted by <br />Resolution No. 4900 effective May 7, 2007. <br />B. <br /> Resolution No. 4900 has subsequently been amended by Resolution Nos. 4929 <br />and 4943. In addition, inflationary adjustments of Systems Development Charges for Local <br />Wastewater System, Stormwater System, and Transportation System were adopted by <br />Administrative Order No. 58-08-02-F, effective April 3, 2008. <br />C. <br /> Based on: (1) the Park development/renovation cost adjustment using the <br />national 20-city average Construction Cost Index as published by the Engineering News-Record; <br />and (2) the Park land acquisition cost adjustment using the Lane County Assessment & Taxation <br />Office’s published 2008 Sales Ratio Report, it is necessary to adjust the SDCs by implementing a <br />16.0% increase in the Parks SDC for residential development, and a 22.0% increase in the Parks <br />SDC for nonresidential development. <br />D. <br /> Based on the national 20-city average Construction Cost Index as published by <br />the Engineering News-Record, it is necessary to amend the Systems Development Charges by <br />implementing a 5.7% inflationary increase for Local Wastewater System, Stormwater System, <br />and Transportation System. <br />E. <br /> Section 2.4 of the SDC Methodologies requires that revisions to fees by more than <br />five percent shall be established by resolution of the City Council. <br />F. <br />These inflationary adjustments to the Systems Development Charges are in <br />conformity with applicable state law, authorized by EC 7.710(5) and Section 2.4 of the <br />Methodologies, and should be implemented effective April 3, 2009. <br />NOW, THEREFORE,based upon the above findings, <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a <br />Municipal Corporation of the State of Oregon, as follows: <br />Resolution – Page 1 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.