Laserfiche WebLink
TABLE A3 <br />WILLAMETTE STREET COSTS <br />Praj. <br /># Descri tion F1 F2 F3 F4 <br />1 Signal System -Add 18th/19th * 12.0 12.a 72.0 12.Q <br />23 Willamette @ 19th - New Signal 15.o 75.0 15.4 <br />2~ W~~~amette St• 13th -~ Zath 68.0 68.0 <br />25 Wi 11 amette @ 13th - Signal l~o~d. 1.6 7, 6 T.6 <br />3D Willamette St. 11th - 19th 55,E <br />31 Wi11 amette ~ 20th - New Si nal 15.0 <br /> Total Cost 12.4 222.6 222.6 285.D <br />*This is a portion of project #1 which would install new traffic controllers and <br />connect the signals on east 18th and 19th with the city's central computer, This <br />portion would only involve the intersections of Willamette, Oak, Pearl and High, <br />which is considered essential for the proper functioning of the 18th and Willa- <br />mette intersection . <br />Willamette Street Crossin s <br />The addition of approximately S,QOO northbound vehicles per day to Willamette <br />Street between 13th and 20th Avenues will adversely affect the ability of <br />pedestrians, bicycles, as well as vehicles to cross Willamette street. Not only <br />will there be less tame between vehicles in the traffic stream, but there will be <br />two stream directions instead of one. The major crossings of Willamette street <br />are: for bicycles at 15th Avenue, and far pedestrians especially the elderly at <br />loth avenue. <br />Neither intersection alone meets signal warrants as set forth in the Manual on <br />Uniform Traffic Control Devices. We should not expect that these two crossin s <br />9 <br />could be combined in order to signalise one of the intersections. 15th Avenue is <br />a well established crosstown bike route extending from the University of Ore on <br />to the Fern Ride Path• ~ , g <br />g , and the current elderly signed crossing links dest~na- <br />tions which are south of 16th Avenue on both sides of Willamette. <br />The solution proposed in this study is to reduce the distance of the crassin s <br />9 <br />and provide better sight distance by extending the curblines at both intersec4 <br />tons 6-feet into the parking lanes on both sides of Willamette Street. This <br />will reduce the distance of the crossing from 48-feet to 3fi-feet, and lace the <br />edestrian or c clist at P <br />p y a point where they can see beyond any parked vehicles. <br />The estimated cast at each ~ntersect~on would be $25,OOo and is included in <br />projects 2~ and 30 listed above. <br />Page 6 <br />