My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19547
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:45:19 PM
Creation date
2/27/2009 1:22:58 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19547
Document_Title
Levying assessments for sidewalk construction in four locations in the City: 1) 7th Avenue and Seneca Road, 2) 18th Avenue and Bailey Hill Rd., 3) 15th Avenue and Charnelton, 4) Clinton Drive and Naomi Drive (Job #2325).
Adopted_Date
4/11/1988
Approved Date
4/11/1988
CMO_Effective_Date
5/12/1988
Signer
Brian B. Obie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS AND RECOMMENDATIONS <br />SIDEWALK CONSTRUCTION IN FOUR LOCATIONS IN THE CITY: <br />1} 7TH AVENUE AND SENECA ROAD; 2} 18TH AVENUE AND <br />BAILEY HILL ROAD; 3} 15TH AVENUE AND CHARNELTON; <br />4) CLINTON DRIVE AND NAOMI DRIVE (CONTRACT #$7-24} <br />BACKGROUND <br />This project was initiated by a petition from property owners <br />adjacent to the sidewalks to be constructed. The properties <br />petitioning for the improvements will bear 100 percent of the <br />improvement costs. <br />Based on the petitions, the City Engineer initiated the project <br />on August 6, 1987 as provided for in the Eugene Code 7.16018}. <br />Property owners were notified of the pending award hearing 10 <br />days prior to the hearing. The project was authorized for <br />construction by the City Council on September 14, 1987. The low <br />bid was submitted by Wildish Corvallis Construction Co, for an <br />amount of $24,111.00. <br />PROJECT <br />The project includes construction of concrete sidewalks. <br />ASSESSMENT <br />Under City of Eugene assessment policy, most of the cast is <br />assessed to the abutting property owners. The costs to be <br />assessed are shown below: <br />Concrete sidewalk $2.60/square foot <br />The cost listed below is the Engineer's estimate and preliminary <br />costs quoted to property owners at the initial hearing following <br />bid opening. <br />Concrete sidewalk $2.63/square foot <br />RECOMMENDATION <br />A hearing regarding these assessments was scheduled for 7:00 P.M. <br />on March 29, 1988 in the City Council Chambers, No one appeared <br />in connection with this project, The Hearings Official recom- <br />mends that the City Council approve the assessments to property <br />owners as set forth above. <br />Jack A. Billin s <br />Hearings Official <br />,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.