My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20357
COE
>
City of Eugene
>
Ordinances
>
2006 No. 20357-20374
>
Ordinance No. 20357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:50 PM
Creation date
1/25/2006 10:44:56 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
1/9/2006
Document_Number
20357
CMO_Effective_Date
1/12/2006
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />compliance with MWMC's discharge permit. MWMC's <br />Capital Improvements Plan, as amended from time to time, <br />shall be used as the guide for detailed planning and <br />implementation of the WPCF project, the beneficial reuse <br />project and the residuals project. <br /> <br />c. Stormwater: Drainage/channel improvements and/or piping systems 36 <br />inches or larger; proposed detention ponds; outfalls; water quality <br />projects; and waterways and open systems. <br /> <br />d. Specific projects adopted as part of the Metro Plan are described in the <br />project lists and their general location is identified in the planned facilities <br />maps in Chapter II of the Eugene-Springfield Metropolitan Public <br />Facilities and Services Plan (Public Facilities and Services Plan). <br /> <br />Appendix Aa Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.