My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20357
COE
>
City of Eugene
>
Ordinances
>
2006 No. 20357-20374
>
Ordinance No. 20357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:50 PM
Creation date
1/25/2006 10:44:56 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
1/9/2006
Document_Number
20357
CMO_Effective_Date
1/12/2006
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX B <br />CHANGES TO THE PUBLIC FACILITIES AND SERVICES <br />PLAN (PFSP) <br /> <br />1. Modify the text preceding existing Table 3 to read as follows: <br /> <br />Planned Wastewater System Improvements <br /> <br />Planned wastewater system improvement projects are listed in tables 3, 4, 4a and 4b. The <br />general location of these facilities is shown in Map 2: Planned Wastewater Facilities, <br />and Map 2a: Existing Wastewater Collection and Treatment Systems. [NOTE: This <br />map presently exists as Map 6 in the Technical Background Report: Existing <br />Conditions and Alternatives and should be incorporated without change.] <br /> <br />2. Insert, following Table 4, Tables 4a and 4b, as follows: <br /> <br />MWMCW <br /> <br />Table 4a <br />t T t tS t I <br /> <br />t P . t <br /> <br /> astewa er rea men ys em mprovemen rOJec s <br /> PROJECT NAME PROJECT DESCRIPTION <br />PROJECT # <br />300 WPCF Treatment Includes several construction packages <br /> Project designed to manage and treat <br /> wastewater at the WPCF to the year <br /> 2025. <br />300A Preliminary Treatment Increase preliminary treatment capacity of <br /> headworks to meet anticipated 2025 peak <br /> wet weather flows <br />300B Primary Treatment Enhance existing primary clarifiers and add <br /> primary sludge thickening facilities to <br /> increase primary treatment capacity to meet <br /> anticipated peak wet weather flows <br />300C Secondary Treatment Convert aeration basins, enhance existing <br /> secondary clarifiers, and add secondary <br /> clarifiers to increase secondary treatment <br /> capacity to meet anticipated peak wet <br /> weather flows <br />300D Disinfection/Outfall Convert disinfection system, and increase <br /> bankside outfall capacity <br />300E Biosolids Treatment Increase digestion capacity by enhancing <br /> existing digesters and sludge thickening <br /> capacity and/or adding a digester <br />300F Filtration Add filtration and build related <br /> infrastructure and support facilities <br />300G Reuse Facilities Expand effluent reuse capacity <br />300H Odor Control Expand and/or add odor control facilities <br /> <br />Appendix B Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.