My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20357
COE
>
City of Eugene
>
Ordinances
>
2006 No. 20357-20374
>
Ordinance No. 20357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:50 PM
Creation date
1/25/2006 10:44:56 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
1/9/2006
Document_Number
20357
CMO_Effective_Date
1/12/2006
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />collection system will be necessary to meet demands of growth over this time <br />period. <br /> <br />2. Based on 2003 analysis, the Eugene-Springfield metropolitan area treatment <br />facilities will require facility improvements to address both dry and wet weather <br />regulatory requirements relating to pollutant loads and wastewater flows. <br />Regional and local wastewater improvements to the collection and treatment <br />systems are being planned for and will be implemented to allow for growth within <br />the UGB and for regulatory compliance. <br /> <br />6. Add Table 16a following Table 16, as follows: <br /> <br />Table 16a <br />MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br />Estimate, and Timing Estimate <br /> <br /> <br />WPCF Treatment Pro' ect <br />Preliminary Treatment ($12.8) <br />Primary Treatment ($4.8) <br />Secondary Treatment ($24.7) <br />Disinfection/Outfall ($5.6) <br />Biosolids Treatment ($18.3) <br />Filtration ($20.2) <br />Reuse Facilities ($16.) <br />Odor Control ($6.9) <br />Flow Management Facilities ($11.) <br />Residuals Treatment Pro' ect <br />Lagoon Rehabilitation ($4.5) <br />Composting Facility ($.7) <br />Beneficial Reuse Pro' ect <br />Biocyc1e Farm <br />Effluent Reuse <br />Willakenzie Pum Station <br />Screw Pum Station <br />Glenwood Pum Station <br />TOTAL: <br />*Cost estimated in 2004 dollars <br /> <br />300 <br />300A <br />300B <br />300C <br />300D <br />300E <br />300F <br />300G <br />300H <br />3001 <br />301 <br />301A <br />301B <br />302 <br />302A <br />302B <br />303 <br />304 <br />305 <br /> <br />2010 <br />2012 <br />2017 <br />2010 <br />2013 <br />2020 <br />2018 <br />2012 <br />2010 <br /> <br />$5.2 <br /> <br />2012 <br />2017 <br /> <br />$4.6 <br /> <br />($0.6) <br />($4.) <br /> <br />2008 <br />2017 <br />2010 <br />2010 <br />2012 <br /> <br />$6. <br />$2. <br />$0.5 <br />$138.6 <br /> <br />7. Add a new chapter to the Public Facilities and Services Plan, to be Chapter <br />VI., reading as follows: <br /> <br />Appendix B Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.