My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19596
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:45:42 PM
Creation date
3/3/2009 1:40:39 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19596
Document_Title
Levying assessments for sanitary sewer in a portion of Airport Road, beginning approximately 500 feet west of Highway 99 and proceeding west to the existing sanitary sewer.
Adopted_Date
2/13/1989
Approved Date
2/13/1989
CMO_Effective_Date
3/16/1989
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS AND RECOMMENDATIONS <br />SUBJECT: SANITARY SEWER IN A PORTION OF AIRPORT ROAD, <br />BEGINNING APPROXIMATELY 500 FEET WEST OF HIGHWAY <br />99 AND PROCEEDING WEST TO THE EXISTING SANITARY <br />SEWER (CONTRACT #8$-Ol) <br />BACKGROUND <br />This project was initiated by a petition and annexations of pro <br />perties within the area of Airport Road, beginning approximately <br />500 feet west of Highway 99 and proceeding west to the existing <br />sanitary sewer. <br />Based on the 84 percent petition, and recent annexations to the <br />City of Eugene, the City Engineer initiated the project as pro- <br />vided for ~n the Eugene Code 7.160(83, on October 9, 1987. <br />Property owners were notified of the pending award hearing 10 <br />days prior to the hearing. The project was authorized for <br />construction by the City Council on January 26, 1988. The low bid <br />was submitted by Dan D. Alsup, Contractor, Inc., for an amount of <br />$22,985.oa. <br />PROJECT <br />The project includes 790 lin, ft, of 8" PVC sanitary sewer pipe, <br />two manholes, and service lines. <br />ASSESSMENTS <br />Under City of Eugene assessment policy, most of the cost is <br />assessed to the abutting property owners. The costs to be <br />assessed are shown below: <br />Lateral sewer $ 0.112/square foot <br />Sanitary Service $ 1,811.18/each <br />Trunk levy $ 0.025/front foot <br />Costs listed below are the Engineer's estimate and preliminary <br />costs quoted to property owners at the award hearing following <br />bid opening. <br />Lateral sewer $ 0.121/square foot <br />Sanitary sewer $ 2,000.12/each <br />Trunk levy $ 0.025/front foot <br />FINDINGS AND RECOMMENDATIONS - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.