My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-87-01
COE
>
City of Eugene
>
Administrative Orders
>
1985-89
>
Admin Order 58-87-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:50:02 AM
Creation date
3/10/2009 2:30:34 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
5/26/1987
Document_Number
58-87-01
CMO_Effective_Date
5/26/1987
Author
Christine Andersen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~,r "'\ ~ 4t: -<0:-1- c \ <br />:..\}:-".""*~_,,..-l~-U....,...,.......~* <br /> <br />ADMINISTRATIVE ORDER <br />OF THE <br />PUBLIC WORKS DIRECTOR <br /> <br />City of Eugene, Oregon <br /> <br />In order to: <br />A. Charge to local improvement districts, engineering fees that closely <br />reflect average costs, and, <br /> <br />B. Provide a fair and equitable charge for services to property owners, <br /> <br />The Public Works Director finds that: <br />1. The amount currently charged for engineering services to local <br />improvement districts is not adequate to recover the actual costs <br />incurred. <br /> <br />2. A study and analysis of these fees is underway and needs to be <br />completed to determine a reasonable and equitable charge rate. The <br />estimated completion date for the analysis is September 30, 1987. <br /> <br />3. An interim increase in the current charge rate needs to be implemented <br />pending completion of the study and analysis in order that the City may <br />recover, on current and new projects, an amount that more closely reflects <br />actual costs. <br /> <br />4. A preliminary analysis indicates that engineering costs over the past <br />five years have averaged 19.15% of project construction costs. <br /> <br />Based on the above findings, the Public Works Director orders that: <br />Property owners in local improvement districts be assessed a charge for <br />engineering services at a rate of 19% of actual project construction <br />costs. This rate will apply to all projects assessed after May 1, 1987 <br />until changed by administrative order. <br /> <br />This 19% rate is considered an interim rate adjustment pending final <br />recommendations from the rate study and analysis. Should the 19% rate <br />be determined by the analysis to meet the objectives stated in A and B <br />above, then that rate will remain in effect until further action by the <br />Public Works Director. Should the 19% rate require further adjustment, <br />either increased or decreased, then a new administrative order will be <br />issued by the Public Works Director which would apply only to those <br />projects assessed after the date of the new administrative order. <br /> <br />In accordance with authority granted by Section 7.007 of the Eugene Code, 1971, <br />this administrative order is issued and dated ~d~ ~~ , 19~. <br /> <br /> <br /> <br />~d~kS Director <br /> <br />engfees <br />
The URL can be used to link to this page
Your browser does not support the video tag.