My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19197
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:43:37 PM
Creation date
3/16/2009 2:26:51 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19197
Document_Title
Ordinance concerning land use application processes; amending, adding and repealing Sections of the Eugene Code, 1971; & providing for an effective date. (See Ordinance for complete list of effected Sections.)
Adopted_Date
11/16/1983
Approved Date
11/16/1983
CMO_Effective_Date
1/1/1984
Signer
R. A. "Gus" Keller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/9~9' 7 <br />1. When proposed as a combination residentialw~ <br />commercial planned unit development: uses and buildings as <br />listed in ~a} above and those listed as permitted outright <br />ar conditionally in the zoning district in which the <br />development will be located. <br />2. When proposed as a residential or commercial <br />planned unit development: uses and buildings as <br />permitted outright or conditionally in the zoning district <br />in which the development will be located. <br />~c} I-I zone: uses and buildings permitted <br />outright or subject to site review. <br />~d} I-2 and I~-3 zones: uses and buildings as permitted <br />outright, conditionally, or with site review in the use <br />district wherein the development will be located. <br />~S} Professional coordinator and deli n team, Professional <br />coordinators and design teams shall comply with the following: <br />.~ ~a} services. A professional coordinator, licensed in the <br />state of Dregan to practice architecture, landscape architecture <br />or engineering, or an American Institute of Certified Planners <br />member in good standing shall ensure that the required plans are <br />prepared and executed. The professional coordinator shall also <br />be the liaison between the applicant and the city. <br />fib} Address and attendance. Unless waived by the planning <br />director, the coordinator or his or her professional re resenta-~ <br />P <br />tine shall maintain a ,Lane County address. The coordinator or at <br />least one design team member shall attend all public meetings at <br />which the proposed development is discussed. <br />~c} Design team_~designation. Except as provided for waivers, <br />a design team, consisting of an architect, a landscape architect, <br />and an engineer, or engineer and land surveyor, shall be designated <br />by the professional coordinator to prepare appropriate plans. Each <br />team member must be licensed to practice his or her profession in <br />the State of Oregon. <br />~d} Desi n team artici anon and waiver. Unless waived by <br />the planning director upon proof by the coordinator that the scope <br />of the proposal does not require the services of all members, the <br />ent7 re des gn team shal 1 participate i n the preparation of tenta- <br />tive and final plans. <br />fie} Desii c~n,,,,tea,m change, written notice of any change i n <br />design team personnel shall be submitted to the planning de artment <br />p <br />within five days of the change. <br />~ f } Plan certification . Certification of the services of the <br />professionals responsible for particular drawings shall appear on <br />those drawings. To ensure comprehensive review by the design team <br />of all plans far compliance with these regulations, the cover sheet <br />shall contain a statement of review endorsed with the signatures <br />of all designated members of the design team. <br />fig} Project certification. When a planned unit development <br />or any phase thereof is completed, the coordinator shall assure <br />that each design team member certifies to the city in writing <br />that the portion of the project in which he or she was involved: <br />I. Meets the standards of his or her profession, <br />2, Conforms to approved plans and conditions, and <br />3. Conforms to other applicable city standards and <br />regulations, <br />n of ce in re ulat~ <br />9 Mo~ifi.catio ,,, ,rta,,' ~,,,~,,,_ 'ons. Except as otherwise stated <br />i n these regul ate ons, fence and ~wal 1 provisions, general provisions ertai ni n <br />p g <br />ordinance -~~4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.