My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-96-01
COE
>
City of Eugene
>
Administrative Orders
>
1995-99
>
Admin Order 58-96-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:50:18 AM
Creation date
4/7/2009 5:15:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
1/22/1996
Document_Number
58-96-01
CMO_Effective_Date
1/22/1996
Author
Gary L. Ludeke
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Administrative Order <br />of the <br />Traffic Engineer of the City of Eugene, Oregon <br /> <br />Establishing Two-Way Traffic <br />on Jefferson Street between 1st Avenue and 6th Avenue <br /> <br />Criteria for Administrative Action <br /> <br />The administrative action of the Traffic Engineer of the City of Eugene, Oregon, establishing two- <br />way traffic on Jefferson Street between 1 st Avenue and 6th Avenue is based on the following <br />criteria: <br /> <br />(a) Traffic engineering principles and traffic investigations: <br /> <br />. Roadway and intersection capacity: two-way operation will not cause <br />capacity problems on the roadway or at any of the intersections. <br /> <br />. Safety: In the six years from 1989 through 1994, there were 26 reported <br />accidents on Jefferson Street between 1st Avenue and 6th Avenue. Fifteen <br />of the accidents occurred at 6th Avenue. The two-way operation may <br />result in a slight increase in traffic accidents, as it requires motorists, <br />bicyclists, and pedestrians to observe traffic coming from two directions. <br />Traffic conditions and accidents will be monitored to determine if any <br />changes are necessary to increase the safety of the two-way street. <br /> <br />. Transit: Two-way operation will increase possible transit options. <br /> <br />. Traffic signs, markings and signals: Motorists will be informed of changes <br />with appropriate signing. Signs, markings and signals will be added, <br />removed, or modified as needed to comply with the Manual on Uniform <br />Traffic Control Devices. <br /> <br />. Intersection Control: Stop controls will be installed for northbound <br />Jefferson Street at 5th Avenue, making it a four-way stop. A Stop control <br />will be installed for northbound Jefferson Street at 1st Avenue, making it a <br />two-way stop. <br /> <br />. Railroad crossing: Southern Pacific will move the crossing gate at the <br />northeast corner of the crossing to the southeast corner. <br /> <br />. Roadway lighting: The street light pole on the west side of Jefferson Street <br />south of the railroad tracks will be moved to the east side of the street, to <br />provide room for the relocation of the driveway from Grain Millers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.