My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-96-26-F
COE
>
City of Eugene
>
Administrative Orders
>
1995-99
>
Admin Order 58-96-26-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:50:21 AM
Creation date
4/7/2009 5:37:41 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
1/22/1997
Document_Number
58-96-26-F
CMO_Effective_Date
2/1/1997
Author
Linda Norris
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />material impacts are occurring and the cause of impact is directly related to a construction <br />activity from a separate parcel. <br /> <br />Annual landscape activities. Activities necessary to maintain the health and function <br />of developed landscaped areas, including but not limited to: tilling, sodding, mowing, <br />aerating, and pruning. <br /> <br />Certified professional. A person who holds an Oregon license in one of the following <br />professions: engineer, architect, landscape architect, or is in a similar profession as <br />determined by the City Manager; or a person who is certified as a geologist or as a <br />professional in erosion and sedimentation control by the International Erosion Control <br />Association, or any other similar organization, or by the City, as determined by the City <br />Manager. <br /> <br />City Manager. The City Manager of the City of Eugene, or the Manager's designee. <br /> <br />Construction activity. An activity used in the process of developing, redeveloping, <br />enhancing, or maintaining land, including but not limited to: land disturbance, building <br />construction, paving and surfacing, storage and disposal of construction related materials. <br /> <br />Construction footprint. That area of a parcel where disturbance to vegetation <br />and landform is necessary for the construction of buildings, parking lots, walkways, <br />landscaping, utilities, and for staging of construction equipment and other similar uses <br />associated with construction activities. <br /> <br />Construction related materials. Potential water quality pollutants that are used or <br />created during construction activities including, but not limited to; off-site deposits of <br />sediments by vehicles (e.g. tracking, spilling); building material wastes (e.g.. scrap metals, <br />rubber, plastic, glass, masonry, wood; paints and thinners; packaging materials; insulation, <br />plaster grout); hazardous substances (e.g. cleaning solvents; chemical additives; concrete <br />curing compounds; acids for cleaning masonry surfaces; paints, thinners); and concrete <br />washout. <br /> <br />Construction Site Management Plan. A set of maps, data, drawings, and narrative <br />that describes expected runoff from new construction sites and establishes measures to be <br />taken for preventing erosion, sediments, and other pollutants from construction related <br />activities. <br /> <br />Designated buffer. An area established by the Eugene Code, 1971, including but not <br />limited to sections 9.262(3)(b) and 9.264(3), that separates a protected natural resource site, <br />such as a wetland or water feature, from a conflicting use, or its designated buffer area. <br /> <br />Dewatering. The removal and disposal of surface water or groundwater for purposes <br /> <br />Erosion Prevention Administrative Rule R-6.645 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.