Laserfiche WebLink
<br />1920's. Over 2500 feet of concrete walks, a lighting system, two picnic areas and <br />eight acres of irrigated lawn are added. <br /> <br />1952: A proposal to install television stations on the butte is rejected. <br /> <br />1962: A wooden cross with light bulbs (a replacement for the original, neon-lit cross) <br />blows down in the Columbus Day storm. <br /> <br />1960s: The emergency communications towers are built on top of the butte on the site of <br />the old U of 0 observatory. <br /> <br />1963 The Alpha Phi Omega fraternity decides to erect a 51' high concrete cross as a <br />community service project. Public objection halts progress. However, a large <br />concrete cross is installed mysteriously overnight on the Butte, and subsequent <br />public support allows it to be legalized one month after installation. <br /> <br />1967: The Metropolitan Civic Club is formed to research possible uses for Skinner <br />Butte. Many ideas were put forth as a result of a city-wide survey, including <br />tramways, restaurants, high-rise apartments, leveling the butte, keeping vehicles <br />out, or a possible site for OMSI. Most proposals are abandoned partly due to <br />disagreement, lack of funding and difficulties with construction on butte. <br /> <br />1967: The main playground and the octagonal restroom are constructed. <br /> <br />1968: The park expands westward with the purchase of land and the subsequent removal <br />of buildings. One building remains at 169 N. Washington St. and is subsequently <br />occupied by Child Care, Inc., a child care facility for low-income families. <br /> <br />1970: The zoo closes in the park and the last animals are moved out. <br /> <br />1971: Lane County presents the City of Eugene with the keys to a new replica of <br />Skinner's Cabin. Oregon Lewis and Clark Chapters of the DAR donate a plaque <br />during a community dedication ceremony. <br /> <br />1973: The Eugene Jaycees start the "Buck for the Butte" promotion to clean up and <br />enhance the Butte. The City Council approves $5000 for butte improvements to <br />match the Jaycees' pledge. A master plan proposal is drafted for the top of the <br />butte and used in subsequent cleanup and restoration efforts. The proposal was to <br />turn the butte into a passive recreation area with irrigated turf and viewpoints. <br /> <br />1973: The old concrete reservoir (1906) is removed as a first step in community- <br />sponsored cleanup operations. <br /> <br />1973-1977: The river-front bike path is constructed through the park. <br />