My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-02-25-F
COE
>
City of Eugene
>
Administrative Orders
>
2002
>
Admin Order 58-02-25-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:48:30 AM
Creation date
4/10/2009 4:24:04 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/31/2002
Document_Number
58-02-25-F
CMO_Effective_Date
5/1/2002
Author
James R. Carlson
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Finding: <br /> <br />used in the Administrative Rule and if not used, remove the terms from <br />Section R-9.6710-A. <br /> <br />The term "complex project" is not used in the Administrative Rule and has <br />been removed from Section R-9.6710-A. The term "design area" is used in <br />the Rule. <br /> <br />Comment 3: R-9.6710-A. Design Area: Clarify the intent of the definition that states "and <br />may be randomly distributed throughout the development site." <br /> <br />Finding: <br /> <br />The definition has been modified. Development sites may have multiple soil <br />types randomly distributed throughout the site with similar design constraints. <br />Evaluation of the design criteria for the entire site is required. <br /> <br />Comment 4: R-9.6710-A. Engineering Properties of Soil and Rock: the proposed <br />Administrative Rule does not provide the quantitative standard method to <br />determine erodibility. <br /> <br />Finding: <br /> <br />The professional is responsible for providing quantitative measures and <br />identifYing the standard by which they made the determination. Design <br />professionals are encouraged to maximize their data collection according to <br />the needs of the project, i.e. an erodibility measure that is necessary for <br />erosion prevention permit application. No change is being made to this <br />provision as a result of this comment. <br /> <br />Comment 5: R-9.6710-A. Engineering Properties of Soil and Rock: Void ratio is an index <br />property not an engineering property. Recommendation to use Terzaghi, <br />Peck and Mesri definition from "Soil Mechanics in Engineering Practice", 3rd <br />Ed. <br /> <br />Finding: <br /> <br />Void ratio has been removed from the list of engineering properties and <br />added to the list of significant index properties. The definition for index <br />properties provided in the Administrative Rules is consistent with Terzaghi, <br />Peck and Mesri's definition. <br /> <br />Comment 6: R-9.6710-A. Expansive Soil: Delete reference to "excessive" expansion and <br />shrinking. <br /> <br />Finding: <br /> <br />Deletion made. <br /> <br />Comment 7: R-9.6710-A. Qualified Registered Professional: Recommended alternative <br />definitions by a number of people submitting comments. <br /> <br />Finding: <br /> <br />EC 9.6710(2) establishes that the geological and geotechnical analysis can be <br />prepared by an Oregon licensed Engineering Geologist or an Oregon licensed <br />Civil Engineer with geotechnical experience; the Rule describes these two <br />professionals under the general term "Qualified Registered ProfessionaL" <br />The Rule cannot alter the code provisions establishing who is allowed to <br />prepare an analysis. No change is being made to this provision as a result of <br />these comments. <br /> <br />Administrative Order - 2 <br />R:\ADMINO RD\RULES\03 geotech2ao. wpd(03/26/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.