Laserfiche WebLink
<br />EXHIBIT A <br /> <br />MINIMUM REQUIREMENTS FOR NUMBER AND SPACING <br />OF PITS AND BORINGS FOR SAMPLING SOilS AND ROCK <br /> <br />Number and spacing of Level 2 sampling pits or borings and Level 3 test borings should conform to the following <br />guidelines. For Level 3, the Geotechnical Engineer will select the locations of borings and the type, freq uency, and depth <br />of samples and/or field strength tests. <br /> <br />Guidelines for Spacing of Borings I <br /> Maximum distance between borings, feet <br />Project Horizontal stratification of soil or rock Minimum number of borings <br /> Uniform Average Non-uniform <br />Multi-story buildings 150 100 50 4 per structure <br />One or two-story buildings 200 100 50 3 per 1 structure <br />Land divisions, development site 500 200 100 2 per acre <br />4 or less acres <br />Land divisions, development site 500 200 100 Minimum 8 per site with 3 <br />4 or more acres per soil unit <br />Bridge piers, abutments, 100 100 25 <br />television towers, etc. <br />Roadways, sewers, pipelines 1000 500 200 - 100 <br />Borrow pits 500 200 100 - 50 <br />(for compacted fill) <br />Earth dams, dikes 200 100 50 <br /> Space preliminary borings 200 to 500 feet apart so that the area between any four <br />New site of wide extent borings includes approximately 10% of the total area. In detailed exploration, add <br /> borings to establish geological sections at the most useful orientation. <br />Development of site on soft Space borings 100 to 200 feet at possible building locations. Add intermediate <br />compressible strata borings when building site is determined. <br />Low-load warehouse building or Minimum of 4 borings at comers plus intermediate borings at interior foundations <br />large area sufficient to define subsoil profile. <br />Slope stability, deep cuts, high Provide 3 to 5 borings on line in the critical direction to provide geological section <br />for analysis. Number of geological sections depends on extent of stability <br />embankments problem. For active slide, place at least one boring up slope of sliding area. <br /> <br />Page 1 of2 <br />