My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 53-91-26
COE
>
City of Eugene
>
Administrative Orders
>
1990-94
>
Admin Order 53-91-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:47:25 AM
Creation date
4/14/2009 4:02:54 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
6/13/1991
Document_Number
53-91-26
CMO_Effective_Date
6/13/1991
Author
Linda Norris
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the inspection; or <br /> <br />c. Multiple visits by City personnel are required because of the <br />failure of an applicant to complete required corrections within the time <br />granted. <br /> <br />The City Manager or designee may waive the penalty for late payment of an <br />inspection fee if: <br /> <br />d. The applicant has applied for and been granted an extension <br />of time within which to pay the fee; or <br /> <br />e. For other good cause shown. <br /> <br />2. The City will not begin its review of a hazardous materials annual license <br />application or issue an interim status permit until the applicant has paid the processing <br />fee and base inspection fee. <br /> <br />3. The classification fee shall be determined on the basis of the classification <br />of the hazardous materials found at each facility during the application review. The fee <br />shall be established in an amount necessary to recover the City's costs associated with <br />review of the facility's Hazardous Materials Management Plan and Emergency Response <br />Contingency Plan and any necessary education and training of those within the facility, <br />including such pre-incident planning assistance as deemed necessary. The classification fee <br />is payable by the applicant within 30 days from completion of the checklist review. <br /> <br />R-3.190-D. Permit/License Auproval or Denial. <br /> <br />1. An application for an interim status permit shall be approved unless: <br /> <br />1.1 The applicant fails to comply with the requirements of Section <br />R-3.190-B of these rules or the requirements of the Eugene Code, 1971; or <br /> <br />1.2 The City has knowledge that issuance of the permit will impose <br />a significant risk to public health, safety or welfare. <br /> <br />2. An application for an annual license shall be approved unless: <br /> <br />2.1 The applicant fails to comply with the requirements of Section <br />R-3.190-A of these rules or the requirements of the Eugene Code, 1971; or <br /> <br />2.2 The City determines that the facility is not in compliance with <br />all applicable federal, state and local laws, rules and regulations, or is not <br /> <br />Administrative Rule R-3.190 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.