My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Ordinance Levying Assessments for West University Alleys
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 02/13/06 Mtg
>
Item 5: Ordinance Levying Assessments for West University Alleys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:52:12 PM
Creation date
2/10/2006 9:17:05 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/13/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Single family dwelling or duplex <br />Other residential <br />Commercial or General Office <br />Industrial <br />Other <br /> <br />1.0 <br />3.0 <br />10.0 <br />10.0 <br />1.0-10.0* <br /> <br />* According to the most intensive use of the parcel most comparable to the use listed above as <br />determined by the city engineer. <br /> <br />The Eugene Code calls for the costs of alley construction to be assessed to the property abutting <br />the alleys. <br /> <br />Estimated Costs Based on the low bids received, the Engineer estimated the costs of the project <br />to be: <br /> <br />Estimated Total Assessable Cost <br />Estimated Total City Cost <br /> <br />$1,670,779 <br />$ 3,670 <br /> <br />Estimated Total Project Cost <br /> <br />$1,674,449 <br /> <br />Actual Costs. The final actual costs were higher than the estimated costs. <br /> <br />Total Assessable Cost <br />Non-assessable City Cost <br /> <br />$1,788,602 <br />$ 63,720 <br /> <br />Total Project Cost <br /> <br />$1,852,322 <br /> <br />The non-assessable City share for this project is funded from Transportation Utility Fund, <br />Stormwater Utility Fund and Wastewater Utility Fund in the amount of $63,720. The <br />Transportation Utility Fund portion is $24,961 and included repair of several existing alley <br />driveways and street pavement preservation work. The Stormwater Utility Fund amount is <br />$18,453 and included repair of existing stormwater systems. The work funded by the Wastewater <br />Utility Fund cost $20,306 and included repair to existing wastewater systems. <br /> <br />The final project costs were higher than estimated. This was due to higher staff costs than <br />expected for engineering and public involvement. Also, there were additional construction costs <br />for overexcavation to stabilize the base prior to paving, extra tree preservation work, unexpected <br />underground utility conflicts and additional repair work to existing pavements, the storm drain <br />system and the wastewater system. <br /> <br />LOCAL IMPROVEMENT DISTRICT ASSESSMENTS FOR ALLEY IMPROVEMENTS IN THE WEST <br />UNIVERSITY NEIGHBORHOOD Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.