My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Ordinance Levying Assessments for West University Alleys
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 02/13/06 Mtg
>
Item 5: Ordinance Levying Assessments for West University Alleys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:52:12 PM
Creation date
2/10/2006 9:17:05 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/13/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />two properties along the same alley of roughly the same size could have differing <br />assessments. Mr. Klope explained again that if properties were zoned for different uses, <br />or if they were now being used differently, the weighting system would result in different <br />assessments, even though they were the same size. <br /> <br />The next member of the public to speak was Mr. Philip Farrington, representing <br />Peace Health. Mr. Farrington began by describing the two properties owned by Peace <br />Health that are subject to assessment. Both properties are used for parking, one for <br />contractors who might be working on the Peace Health facilities in the area, and the <br />second for valet parking for the physician's building. One of the alleys is also used as a <br />"slip lane" to help access the parking garage in the area. Mr. Farrington indicated that <br />actual use of the properties and the alleys adjacent to the properties is very small. He did <br />not believe that it was appropriate to use the same weighting factors for these properties <br />as was used for commercial properties in the area. Mr. Farrington noted that the Code <br />made a distinction between different types of residential use, and he felt that there should <br />be a similar distinction made for non-profit and for profit uses of assessed property. <br /> <br />Mr. Farrington also questioned the appropriateness of the allocation of costs and <br />the assessment methodology. Mr. Farrington questioned whether it was appropriate <br />under the Code to charge property owners all the "soft" costs of the project. He felt that <br />some of these costs were ordinary costs of city operations, and should not be included in <br />the assessment. Mr. Farringdon noted that in street assessments, the City had decided not <br />to assess one hundred percent of the costs to the property owners. He felt that this would <br />be appropriate here as well, which would mean that the property owners should not have <br />to absorb all the overhead costs of the project. <br /> <br />Mr. Farrington closed by arguing that there were other properties in the area, <br />properties that were not being assessed, that benefited as much or more than the Peace <br />Health properties. Using the 160 foot depth measurement in the Code, Mr. Farrington <br />argued that here were several properties within 160 feet of the alley, that had access <br />across neighboring properties and thus used the alley as much or more than do the <br />properties along the alley. Mr. Klope explained that while the original discussion arising <br />from the West University Task Force had been concerned with the entire area, the Local <br />Improvement District only included properties abutting the alleys that were improved. <br />Mr. Klope also explained that the 160 foot depth was limited only to properties abutting <br />the alley, and concerned the maximum area of the property that was subject to <br />assessment. <br /> <br />The next member of the audience to speak was Mr. Bill Kloos, representing <br />Diamond Parking. Mr. Kloos began by describing the difficulties that he had <br />encountered when he contacted Eugene Public Works for more information on the <br />assessment process. The morning of the hearing Mr. Kloos had contacted the <br />engineering staff and had requested access to the engineering files. Mr. Kloos had been <br />told that he must file a public records request, but had not yet been granted access to the <br />files. Project Engineer Steve Gallup told Mr. Kloos that Engineering had tried to contact <br /> <br />Alley Assessment Minutes <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.