Laserfiche WebLink
<br />Per Eugene Code, the assessable cost for each alley is calculated and then one half of the assessable <br />costs are apportioned to the properties based on their front footage abutting the alleys, and one half of <br />the assessable cost are apportioned to the properties based on the area of the properties within 160 feet <br />of the alley, as measured at right angles from the front footage of the parcel. The assessments were <br />calculated separately for each alley based on the existing uses and zoning of the property within each <br />alley. The assessable front foot costs were calculated based on the existing use of the parcels and the <br />assessable area costs were calculated based on the permissible use of the parcels under the zoning of the <br />City. Weighting factors were applied to the front footage and area of each property per the use and <br />zoning of the property as prescribed in Eugene Code and as listed below: <br /> <br />Single family dwelling or duplex 1.0 <br />Other residential 3.0 <br />Commercial or General Office 10.0 <br />Industrial 10.0 <br />Other 1.0-10.0* <br /> <br />*According to the most intensive use of the parcel most comparable to the use listed above as <br />determined by the city engineer. Costs listed below are the estimated costs calculated at the time of the <br />formation of the LID. <br /> <br /> Total Assessable Cost $1,670,779 <br /> Non-assessable City Cost $ 3,670 <br /> <br /> Total Project Cost $1,674,449 <br /> <br />Below are the final costs based on actual project costs: <br /> <br /> Total Assessable Cost $1,788,602 <br /> Non-assessable City Cost $ 63,720 <br /> <br /> Total Project Cost $1,852,322 <br /> <br />The total assessable cost for each alley and the weighted front foot and weighted area cost for each alley <br />are shown in Attachment D in the Memo to the Hearings Official. <br /> <br />The non-assessable City share for this project is funded from Transportation Utility Fund, Stormwater <br />Utility Fund and Wastewater Utility Fund in the amount of $63,720. The Transportation Utility Fund <br />portion is $24,961 and included repair of several existing alley driveways and street pavement <br />preservation work. The Stormwater Utility Fund amount is $18,453 and included repair of existing <br />stormwater systems. The work funded by the Wastewater Utility Fund cost $20,306 and included repair <br />to existing wastewater systems. <br /> <br />The final project costs were higher than estimated. This was due to higher-than-expected staff costs for <br />engineering and public involvement, and additional construction costs for overexcavation to stabilize the <br />base of the alleys prior to paving, extra tree preservation work, unexpected underground utility <br />conflicts, and additional repair work to existing pavements, the storm drain system and the wastewater <br />system. <br /> L:\CMO\2006 Council Agendas\M060213\S0602135.doc <br /> <br />