Laserfiche WebLink
<br />LAW OFFICE OF BILL KLOOS, PC <br /> <br />OREGON LAND USE LAW <br /> <br />375 W. 4TH STREET, SUITE 204 <br />EUGENE, OR 97401 <br />TEL (541) 343-8596 <br />FAX (541) 343-8702 <br />E-MAIL BILLKLOOS@LANDUSEOREGON.COM <br /> <br />January 30, 2006 <br /> <br />Milo Mecham <br />Eugene Hearings Official <br />c/o Lane Council of Governments <br />99 East Broadway, Suite 400 <br />Eugene, OR 97401 <br /> <br />Re: Hearing on Assessment for West University Neighborhood Alleys LID <br />Testimony of Diamond Parking and Joel Diamond <br /> <br />Dear Mr. Mecham: <br /> <br />This letter is submitted on behalf of the owners above. Today's staff report to you indicated, on <br />page 2 item 10, that my clients contacted staff and indicated they would be appearing at this <br />hearing. My clients own the properties identified on the Assessment Map documentation as <br />Sequence Numbers 540, 580 and 620. <br /> <br />I ask that the record be left open in this matter, until such time as the Public Works Engineering <br />file on this matter is made available to me for inspection as a public record. I visited public work <br />engineering today to inspect the file. Staff confirmed the file was present, but would not allow <br />access for inspection until approval by the City Recorder's Office and upon filing of a public <br />record inspection request. I filed the public record inspection request today. A copy is attached <br />to this letter. Inspection has not been allowed yet. I have no idea at this point when inspection <br />will be allowed. <br /> <br />Under EC 7.170(1), the costs that may be assessed include the costs of construction, engineering, <br />interest on warrants, advertising, and providing notice of assessments and overhead. It is not <br />clear, from the summary documentation that has been provided to me thus far, that the "project <br />total" costs to be assessed includes only costs that are allowed. More detailed information is <br />needed. That information may be in the public records, which have not been provided yet. <br /> <br />At first blush, it appears that some of the costs claimed to be project costs are not costs that may <br />be included. For example, the "project direct total" is $1,202.939. In addition to this, there are <br />indirect costs of$650,703. The indirect costs are 54% of the direct costs. The vast majority of <br />the indirect costs are an "engineering charge" ($546,217). It is not clear what is included in these <br />indirect costs. Are all of the "engineering charges" for city staff within the scope of what can be <br />charged to this project? When did these city staff charges begin to accrue? Was it when the City <br />Council authorized the LID? Was it before that time? The Hearing Official needs to determine <br />what costs are being charged to this project, for what period of time, and whether those charges <br />are appropriate. My clients can provide more detailed information for the Hearings Official to <br />