Laserfiche WebLink
<br />PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING / GLENWOOD FACILITY PLAN PHASE II <br /> <br />The following items were on display at the meeting: <br /> <br />· Introduction, purpose of the study and the open house <br /> <br />· Preliminary Interchange Concepts 1 <br /> <br />· Environmental and Land Use Conditions <br /> <br />· Economic Development and Accessibility Benefits <br />· Traffic and Circulation Benefits <br /> <br />· Traffic Issues <br /> <br />· Cost and Constructability Issues <br /> <br />· Stakeholder and Policy Issues <br /> <br />Handouts distributed at the open house included the following: <br /> <br />· Comment form <br /> <br />· Background information paper <br /> <br />As of January 24, 2006, a total of 135 comment sheets were received at the open houses and <br />38 comments were received via email. The comments are summarized below. Copies of each <br />of the actual comment sheets are provided as a separate document. <br /> <br />1 Categories for Interchanges: <br />Category 1: Full Interchange at Franklin Boulevard, with either a Diamond or <br />Cloverleaf design <br />Category 2: Partial Interchange at Franklin Boulevard, with either a Partial Diamond <br />or Partial Cloverleaf design <br />Category 3: Split Interchange at Franklin and Glenwood Boulevard, with either a <br />Two Half-Diamonds or Connected Diamonds design <br />Category 4: Full Interchange at Glenwood Boulevard, with either a Full Diamond <br />design <br /> <br />OPEN HOUSE SUMMARY-012406.DOC <br />