My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Overview <br /> <br />Outcome 4: Maximize reliability and useful life of regional assets and infrastructure. <br /> <br />Indicators: Performance: <br /> FY 02-03 FY 03-04 FY 04-05 <br /> Actual Projected Target <br /> <br />· Percent of scheduled preventative <br /> maintenance completed 85% 84% 85% <br /> <br /> 90% 97% 90% <br />·Percent ofplarmed maintenance <br /> work <br /> <br /> N/A Assessment Conduct <br />· Maintain infrastructure in good to <br /> excellent condition (rating scale 0 completed, scheduled <br /> to 5, with 5 being excellent) ratings from 4.0 maintenance. <br /> to 5.0 Assessment in <br /> documented FY 07-08 <br /> <br />Outcome 5: Achieve and maintain public awareness and understanding of MIFMC, the <br />regional wastewater system and its relationship to }Yillamette River water quality. <br /> <br />Indicators: Performance: <br /> FY 02-03 FY 03-04 FY 04-05 <br /> Actual Projected Target <br />· MWMC Annual Report Outline Deferred to FY Produced <br /> prepared 04-05 <br /> <br />· Updated MWMC Informational Complete <br /> Brochures -- -- Portfolio <br /> <br />· Public Information Program for Materials <br /> WPCF expansion/upgrades N/A N/A <br /> Developed <br /> <br />Roles and Responsibilities <br />In order to effectively oversee and manage the RWP, the partner agencies provide all staffing <br />and services to MWMC. The following sections describe the roles and responsibilities of each of <br />the partner agencies, and how intergovernmental coordination occurs on behalf of the <br />Commission. <br /> <br />City of Eugene <br />The City of Eugene supports the RWP through representation on MWMC, provision of operation <br />and maintenance services, and active participation on interagency project teams and committees. <br />Three of the seven MWMC members represent Eugene--two citizens and one City Councilor. <br />Pursuant to the IGA, the Eugene Wastewater Division operates and maintains the Regional <br />Water Pollution Control Facility (WPCF), the Biosolids Management Facility (BMF) and <br />associated residuals and reclaimed water activities, along with regional wastewater pumping <br />stations and transmission sewers. In support of the RWP, the Division also provides technical <br /> <br /> April, 2004 DRAFT Page 6 FY 04-05 BUDGET AND <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.