Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br /> REGIONAL WASTEWATER PROGRAM <br /> CAPITAL PROGRAMS <br /> <br />The FY 04-05 CIP budget is included in the administration portion of the RWP budget. The <br />five-year CIP begins on page 47. For the past several years, the five-year CD has been primarily <br />composed of projects identified by the 1997 Master Plan, the 1997 Biosolids Management Plan, <br />and the WWFMP, 2001. The WWFMP provided the basis for wastewater treatment facility <br />capital improvements related to peak wet weather flow. In order to determine design parameters <br />and to identify the impacts of these projects on other treatment facility processes, a Wet Weather <br />Flow Pre-Design Project was initiated in FY 02-03. This project evolved into a comprehensive <br />Facilities Plan in 2003 to address the increased regulatory requirements contained in the new <br />NPDES wastewater discharge permit. <br /> <br />The Regional Wastewater Facilities have been in operation for nearly 20 years and a <br />comprehensive Facility Plan has been undertaken since the original "208 Study." That formed <br />the plans for the facilities much as they are today. The 2004 Facilities Plan identifies several <br />process areas that are at or near capacity and identifies projects that will assure that the Regional <br />Wastewater Facilities have sufficient capacity to meet the needs of current and future users <br />through the year 2025. The FY 04-05 CIP budget is composed of projects carried over fi.om <br />previous years and projects identified in the 2004 Facilities Plan. CD project summaries are <br />provided below. The FY 04-05 CII:' is fimded using a combination of Capital Reserves and <br />SDCs. <br /> <br />Other capital programs, including the Equipment Replacement Program, Major Capital Outlay, <br />and Major Rehabilitation Program are included in the operations portion of the RWP budget. <br />The basis for planning in these capital programs involves an annual evaluation byoperations <br />staff of major assets, where they are in their projected life cycles, performance/maintenance <br />records, etc. FY 04-05 funding for these programs will come from the Equipment Replacement <br />Reserve and Capital Reserve. Itemized lists of and budgets for Equipment Replacement <br />purchases, Major Infrastructure Rehabilitation projects, and Major Capital Outlay are included <br />on pages 30-31. <br /> <br /> CAPITAL IMPROVEMENT PROJECTS <br /> <br />Carryover Projects: <br /> <br />These projects represent a continuation of previously budgeted activities. <br /> <br />Biocycle Farm Land Application and BMF Reclaimed Water Supply <br /> <br />FY 04-05 Capital Budget = $2,100,000 <br /> <br />During FY 03-04, the project scope was modified to incorporate several projects which had been <br />budgeted separately. They included: (1) the addition of a reclaimed water conveyance system to <br />serve both the dewatering facility and the Biocycle Farm; (2) the connection of the reclaimed <br />water line to the biosolids sludge force main to allow mitigation of struvite buildup; and (3) the <br />addition of sludge strain presses. <br /> <br />Completion of the first 190-acre phase of Biocycle Farm was completed in the spring of 2004. <br />Construction work on the reclaimed water pipeline and related pump station along with phase <br />two of Biocycle Farm, are budgeted in FY 04-05 budget year. <br /> <br /> April, 2004 DRAFT Page 26 FY 04-05 BUDGET AND CIP <br /> <br /> <br />