Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br /> Enhancing the existing clarifiers will increase primary treatment capacity, increase capacity to <br /> treat base and peak flows, and improve effluent quality and reliability so that a blended primary <br /> and secondary effluent can meet the current NPDES total suspended solids limits. <br /> <br />Design and work on two clarifiers is planned for FY 04-05. Work on the remaining two primary <br />clarifiers is planned for FY 05-06. <br /> <br /> Secondary Clarifier Enhancements <br />FY 04-05 Capital Budget = $5,300,000 <br /> <br />Expected cash flow: * FY 04-05 $1,300,000; FY 05-06 $2,700,000; FY 06-07 $1,300,000. <br /> <br />This project is part of the overall MWMC Facilities Plan strategy to increase the peak flow <br />treatment capacity. The project includes design and construction of baffling, inlet energy <br />dissipation, changing out of the floccUlation well, construction of an outboard launder, and <br />retrofitting of the suction header for the existing eight clarifiers. It also includes secondary gates. <br />Enhancing the existing clariflers will increase the secondary treatment capacity, alleviate current <br />operational problems, and will increase secondary treatment capacity for base and peak flows. <br />Effluent quality and performance reliability will also be improved. These planned efficiency/ <br />effectiveness improvements enable the deferral of the new secondary clarifiers originally <br />planned for FY 04-05. <br /> <br />Design and work on two clarifiers is planned for FY 04-05. Work on four clarifiers is planned for <br />FY 05-06 with the final two clarifiers being completed in FY 06-07. <br /> <br />South Aeration Basin Improvements <br />FY 04-05 Capital Budget = $6,900,000 <br /> <br />Expected cash flow: * FY 04-05 $1,725,000; FY 05-06 $5,175,000. <br /> <br />The MWMC NPDES wastewater discharge permit, issued by the Department of Environmental <br />Quality, in 2002, placed a limit on the allowable dry weather (May 1 st through October 31 st) <br />discharge of ammonia for the first time. In order to meet this limit, the MWMC Facilities Plan <br />identifies these projects to increase the dry weather aeration basin treatment capacity to 65 mgd <br />with respect to ammonia (i.e., with nitrification) and increase the sustained (i.e., on a weekly <br />basis) wet weather treatment capacity to 130 mgd. This project includes design and construction <br />to add step feed processing, anoxic selectors, fine bubble diffusers, and remove hydraulic <br />restrictions in' both south and north basins (effluent gates). It also includes future primary <br />effluent flow control gates for both north and south basins. <br /> <br />Design work and the beginning of construction is planned for FY 04-05. The remaining <br />construction is planned for FY 05-06. <br /> <br />Construction Management Facilities <br />FY 04-05 Capital Budget = $100,000 <br /> <br />This project is necessary to provide on-site office facilities for construction management staff at <br />the WPCF during the 10-year MWMC facility construction effort. A project and staffing plan, to <br />be developed in FY 04-05, will determine the type, size and location of these necessary facilities. <br /> <br />· Cash Flow - In governmental budgeting, projects are fully budgeted in the fiscal year in which the contract is <br /> awarded. At the end of each fiscal year, unspent funds are carded forward until the project is completed. This <br /> <br /> April, 2004 DRAFT Page 28 FY 04-05 BUDGET AND CIP <br /> <br /> <br />