My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />OTHER CAPITAL PROGRAMS <br /> <br /> · Equipment Replacement <br /> <br />The FY 04-05 Capital Programs budget includes the equipment replacement projects identified <br />in the table below. <br /> <br /> Proposed Equipment Replacement Projects - FY 04-05 <br /> Project Description Proposed Budget <br /> Raw Sewage Pumps~ (2) 200,000 <br /> Field Control Units for DCS 480,000 <br /> Inductively Coupled Plasma Unit 100,000 <br /> Pressure Line Gates 33,000 <br /> Plant Electrical System 720,829 <br /> Activated Sludge Pump 25,000 <br /> Boiler Controls 45,000 <br /> Phone System 56,044 <br /> Computer Replacement 30,568 <br /> Fleet Replacement 314,100 <br /> Total $2,004,541 <br /> <br /> · Major Rehabilitation <br /> <br />The FY 04-05 Capital Programs budget includes the Major Rehabilitation projects identified in <br />the table below. <br /> <br /> Proposed Major Rehab Projects - FY 04-05 <br /> Project Description Proposed Budget <br /> Screw Pump Coating 120,000 <br /> Secondary Clarifier Floor Coating 85,000 <br /> Raw Sewage Pump Room Roof Replacement 30,000 <br /> Operations Building Upgrade 50,000 <br /> Primary Building Roof Replacement 25,000 <br /> Parking Lots & Roadways Asphalt Sealing 40,000 <br /> Total $350,000 <br /> <br />April, 2004 DRAFT Page 30 FY 04-05 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.