My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Eugene Budget Detail <br /> <br />The section further provides necessary analytical services in support ofwastewater <br />treatment, residuals management, industrial source control, stormwater monitoring, and <br />special project activities of the Wastewater Division. The laboratory's services include <br />sample handling and analyses of influent sewage, treated wastewater, biosolids, <br />industrial wastes, cannery wastewater, stormwater, and groundwater. Information from <br />the laboratory is used to make treatment process control decisiOns, document <br />compliance with regulatory requirements, demonstrate environmental protection, and <br />ensure worker health and safety. <br /> <br />The Sampling Team is responsible for all of the sampling activities related to regional <br />wastewater program functions. These include the Eugene pretreatment program, <br />wastewater treatment process control, effluent and ambient water quality, groundwater <br />quality, facultative sludge lagoons, and stormwater samples. This section also <br />evaluates and reports on the sampling data for various programs. <br /> <br />MANAGEMENT INFORMATION SERVICES (MIS) <br />The MIS section provides services for electronic data gathering, analysis, and reporting <br />as necessary in compliance with regulatory requirements and management functions. <br />This section also maintains the electronic communication linkages with the City of <br />Eugene and the Regional Information System, and supplies technical expertise and <br />assistance in the selection, operation, and modification of computer systems (hardware <br />and software) within the Division. <br /> <br />PROJECT MANAGEMENT <br />Management ofwastewater system improvements and ongoing developments is carried <br />out by the Project Management staff. Activities include problem-solving and action <br />recommendations, project management, technical research, computer-aided design and <br />electronic storage of design drawings, and planning of projects to anticipate and prepare <br />for new regulatory and operational requirements. The Project Management staff <br />develops Request for Proposals and Request for Quotes, coordinate special project <br />activities between work sections, and coordinates the procurement of building permits as <br />necessary in support of project activities. <br /> <br /> April, 2004 DRAF¥ Page 43 FY 04-05 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.