My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUTH AERATION BASIN IMPROVEMENTS <br /> <br /> Facility Process Component <br /> Secondary Treatment <br /> <br />$6,900,000 <br />Total Cost <br />Design & Engineering 690,000 690,000 <br />Construction 6~210,000 . 6,210~000 <br /> TOTAL [~:~:.}~i?~ :' ~ i~::?~' ~:=~0 <br />FUNDING SOURCE <br />Capital Reserve 2,829,000 2,829,000 <br />Improvementment SDC Reserve 4,071,000 4,071,000 <br />TOTAL <br /> <br />PROJECT: South Aeration Basin Improvements Design and Construction <br /> <br />DESCRIPTION: Add step feed, anoxic selectors, and fine bubble diffusers to south aeration basin. Remove <br /> hyd~ulic restrictions in both south and north aeration basins (effluent gates). Includes <br /> future pdmary effluent flow control gates for both north and south aeration basins. <br /> <br />JUSTIFICATION: Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to <br /> ammonia (i.e., with nitrification) and increase the sustained (i.e., on a weekly basis) wet <br /> weather treatment capacity to 130 mgd. <br /> <br />PROJECT DRIVER: NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of <br /> wet weather capacity to treat wet weather flows to meet NPDES monthly and weekly <br /> suspended solids limits. <br />PROJECT TRIGGER: Maximum mOnth dry weather flow of 25 mgd requiring nitrification. May flows and <br /> temperatures could require the use of the south aeration basins in conjunction with the <br /> north aeration basins. Peak wet weather flows above 103 mgd require hydraulic <br /> modifications. <br /> <br />TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> <br />ESTIMATED PROJECT COST $6,900,000 <br />(2004 Dollars): <br /> <br />PHASING: Budgeted for FY 2004/05 <br /> <br /> Page 68 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.