My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY CLARIFIER ENHANCEMENTS <br /> <br /> Facility Process Component <br /> Secondary Treatment <br /> <br /> $5,300,000 · <br /> Total Cost <br /> <br />Design & Engineering 520,000 520,000 <br />Construction 4~780~000 4~780~000 <br />FUNDING SOURCE <br />Capital Reserve 3,074,000 3,074,000 <br />Improvementment SDC Reserve 2,226,000 2,226,000 <br />TOTAL <br /> <br />PROJECT: Secondary Clarifier Enhancements Design and Construction <br /> <br />DESCRIPTION: Baffle, add inlet energy dissipation, change out flocculation well, construct outboard <br /> launder, and retrofit suction header for existing 8 clarifiers. <br /> <br />JUSTIFICATION: Enhancing the existing clarh'iers will increase the secondary treatment capacity, alleviate <br /> current operational problems, and will maximize the facilities investment in existing <br /> infrastructure. <br /> <br />PROJECT DRIVER: Increase capacity of secondary treatment for base flows and for peak flows. Improve <br /> effluent quality and performance reliability to meet the current NPDES total suspended <br /> <br />PROJECT TRIGGER: Average secondary clarifier surface overflow rates exceeding 750 gpd/sf or wet season <br /> maximum month flows exceeding 80 mgd. <br /> <br />TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> <br />ESTIMATED PROJECT COST $5,300,000 <br />(2004 Dollars): <br /> <br />PHASING: Budgeted for FY 2004/05 <br /> <br /> Page 70 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.