Laserfiche WebLink
<br />GED when the public parking garage is completed and has a certificate of occupancy, and after <br />final City inspection and approval. <br /> <br />Development Timing <br />Construction of the project shall commence in a timely fashion. <br /> <br />Utilities <br />Public utilities are currently located in the alleys on this block. These include a stormwater line, <br />owned by the City and running north-south and steam distribution lines, owned by Eugene Water <br />and Electric Board, and running north-south and east-west. These will be addressed as follows: <br />1) The stormwater line will remain in place. The City will pay for the costs of rehabilitating <br />this line at an estimated cost of $250,000. GED will build over this line in a manner <br />consistent with City specifications for location of foundations and related issues. <br />2) The steam lines will be relocated in a manner consistent with GED's development plans <br />for the site and EWEB's need to maintain steam distribution. The costs for this <br />relocation will be shared equally between the City and GED and are estimated at between <br />$575,000 and $650,000. <br /> <br />LICMOl2006 Council AgendasIM060222IS060222A.doc <br />