75 residents participated and/or attended the open house. <br />Over the course of two CDCT meetings on June 28 and July 12, the CDCT reached consensus on the <br />conceptual design for all five street segments. The recommended design was presented at a general <br />meeting of the Crest Drive Citizens Association on January 15, 2008. The CDCA passed a motion <br />recommending approval of the design concept for Crest Drive, Friendly Street and Storey Boulevard at its <br />general meeting held on February 12, 2008. The City Council held a public hearing on the concept design <br />on February 19, 2008 and approved the concept design on April 14, 2008. <br />On October 22, 2008 a letter was sent to all property owners within the proposed LID providing basic <br />information about the City’s assessment policy and procedures. The letter also included the assessment <br />estimate of $180 - $200 per front foot with assessments projected to be due in late 2009 or early 2010. At <br />this time the total project cost was estimated at $5.75 million and the assessable portion of the cost at $2.6 <br />million. <br />PROJECT SCOPE <br />The street improvements will consist of 18-foot wide paving (two 9-foot wide travel lanes) with curbs <br />(flat, or at grade, and 6” vertical), concrete walk on at least one side of the street, street lights at pedestrian <br />crossings, traffic calming (speed tables, chicanes, chokers, medians, and traffic circles), street trees, and <br />storm water drainage system with storm water quality facilities. <br />FUNDING AND ASSESSMENTS <br />The longstanding City practice has been for all properties adjacent to streets that have not been improved <br />to City standards to participate in the improvement cost. The funding sources for the City’s or non- <br />assessable share of the improvement project costs are the Capital Road Fund, Stormwater System <br />Development Charges (SDC) Fund and Stormwater Utility Fund. <br />There are 126 abutting property owners that will be assessed for the street portion of the improvement on <br />a per front foot basis as outlined in Chapter 7 of the Eugene Code. Per Eugene Code, property owners of <br />parcels within a low-density residential zone shall be assessed according to the functional classification of <br />the street. On a local street, low density residential properties are assessed for half the pavement width up <br />to 34’ of total width, and associated drainage system for the portion of pavement to be assessed. Because <br />the streets in this proposed LID will be 18’ wide, the property owners will be assessed for the half street <br />width of 9 feet. The City pays for the intersections and a portion of the stormwater drainage <br />improvements. <br />Property owners generally pay for actual frontages with exceptions based on the zoning, land use, lot size, <br />level of development and frontage. With the exception of parcels within a low-density residential zone, <br />developed and partially developed parcels within all zones shall be assessed for the full frontage abutting <br />the street improvement and for 9 feet of the pavement width. <br />Vacant parcels less than one-half acre in size and fully developed parcels with a single family <br />dwelling in residential zoning are assessed for the actual front footage abutting the improvements, <br />except no parcel shall be assessed less than 50 feet or more than 100 feet. <br />Partially developed parcels of one-half acre or larger with a single family dwelling or duplex in a <br />low density residential zone and having more than 100 feet of frontage abutting the improvement <br />shall be assessed for 100 feet of frontage at the time of the improvement, and the remaining <br />frontage shall be delayed until the property is further developed. <br />Vacant parcels of one-half acre of larger shall not be assessed at the time of the street <br />improvement, but will pay the assessment upon development of the property. <br /> <br />