Laserfiche WebLink
<br />ATTACHMENT A <br /> <br /> <br />Public Works <br />Engineering <br /> <br /> <br /> <br />City of Eugene <br />MEMORANDUM <br />858 Pearl Street <br />Eugene, Oregon 97401 <br />(541) 682-5291 <br />(541) 682-5032 FAX <br />Date: <br />March 6, 2006 <br /> <br />To: <br />Mayor Piercy and City Council <br /> <br />From: <br />Fred McVey, 682-5216 <br /> Engineering Data Services Manager <br /> <br />Subject: <br />Clarification of Preliminary Growth Allocation Figures in the PROS Project and Priority <br /> <br />Plan <br /> <br /> <br />In a February 27, 2006 council work session on the PROS Project and Priorities Plan (Project Plan) <br />members of Council requested clarification of the relationship of the Project Plan to the development of <br />an updated parks SDC. Specifically, clarification was sought on the significance of the “preliminary <br />growth allocation” percentages included in the Project Plan and the method of determining these <br />allocation figures. <br />Relationship of Project Plan to Parks SDC <br />Adoption of a project plan is a prerequisite for updating and modifying the parks SDC insofar as a new or <br />modified SDC methodology must demonstrate consideration of the project costs listed in an adopted <br />plan. To be considered for use in developing the parks SDC the adopted plan must meet certain criteria <br />specified in ORS 223.309, specifically that the plan include a list of the capital improvements and the <br />estimated cost, timing and percentage of costs eligible to be funded with revenues from improvement fee <br />SDCs. The preliminary growth allocation figures included in the Project Plan are intended to satisfy the <br />requirement to provide an estimated “percentage of costs eligible to be funded with revenues from the <br />improvement fee”. <br />The need for an estimate of the percentage of SDC funding of projects in the Project Plan has required <br />analysis of parks capacity needs of growth during development of the Project Plan. The capacity analysis <br />used to derive the preliminary growth allocation percentages is consistent with methods, described in <br />more detail below, used in preliminary development of an updated parks SDC methodology. The Project <br />Plan is a reference document to be considered in development of the SDC, but does not prescribe the <br />form of the SDC methodology nor the amount of the SDC. The SDC methodology may consider the <br />Project Plan using a variety of means, factors and assumptions. Various policy and methodological <br />alternatives will be considered through adoption of a modified parks SDC, subsequent to the separate <br />adoption of the Project Plan. For these reasons, the affect of preliminary growth allocation percentages <br />contained in the Project Plan on the future modified parks SDC is variable and has yet to be determined. <br /> <br />Project Plan Growth Allocations <br /> <br />