My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2E - Metro Plan Amendment
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/14/04Mtg
>
Item 2E - Metro Plan Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:36:34 PM
Creation date
6/10/2004 3:20:59 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Execution Draft <br /> <br /> B. Design and construction of streets, utilities, pedestrian and bicycle access, <br /> stormwater facilities and wetland mitigation areas in a manner that will maximize <br /> both the development potential of OWNERS' portion of the SC Tract and the <br /> development of the Parklands for their intended purposes; <br /> <br /> C. Development of recreational facilities to serve the Santa Clara community; and <br /> <br /> D. The Parklands will include a corridor of land (referred to herein as the "Water <br /> Course") to protect and preserve an existing east-west drainage swale that transects <br /> the SC Tract approximately 2,000 feet north of its southern boundary. The Water <br /> Course will be approximately 80 feet wide to provide a buffer zone of approximately <br /> 30 feet on each side of the swale. The Water Course will form a fundamental <br /> component of the storm water management system for the SC Tract. <br /> <br /> 2.4.2 Location of Major Streets. Designation of all arterial streets and all lesser <br /> streets that will abut or provide vehicular passage through the Parklands. <br /> <br /> 2.4.3 Location of Major Utilities. The location of all utilities that will deliver service <br /> to the Parklands or that will pass through the Parklands to serve other areas, and the location <br /> of any utility substations that will be placed in or adjacent to any part of the Parklands. <br /> <br /> 2.4.4 Metro Plan Requirements. All determinations must be provided for the Metro <br /> Plan, including, without limitation, all maps, surveys and depictions of proposed <br /> commercial and residential areas. <br /> <br /> 2.4.5 Other Items. Additional items or alternatives to the items in subsections 2.3.2, <br /> 2.3.3 and 2.3.4 that both parties agree should be determined prior to the UGB/Metro Plan <br /> amendment. <br /> <br /> 2.4.6 Binding Commitment. Prior to the effective date of the UGB amendment, <br /> OWNERS and PARKS shall execute one or more written contracts or instruments to <br /> establish the Preliminary Plan. The Preliminary Plan shall incorporate this Agreement <br /> and may be amended as required to reflect additional agreements between the parties and <br /> to comply with applicable federal, state or local laws. <br /> <br />3. Cost Sharing. <br /> <br /> 3.1 Consultants. PARKS and OWNERS shall each be responsible for one-half of the <br /> fees and expenses of the consultant hired to prepare the Metro Plan amendment application <br /> and one-half of the fees and expenses of any other consultant retained under subsection 2.2. <br /> <br /> Urban Lands and Parks Pre-Planning Development Agreement Page 4 of 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.