My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4 - PH on MWMC Reg. SDCs
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/14/04Mtg
>
Item 4 - PH on MWMC Reg. SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:03 PM
Creation date
6/10/2004 3:21:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br />Develop SDC Schedule - Multiply Capacity Requirements by Unit Capacity Costs <br /> AVERAGE FLOW PEAK FLOW STRENGTH <br /> <br /> Dry Season Max Wet Season Peak Dry Season Average <br /> Month Impact Flow Impact Flow Impact BOD/TSS Strength <br /> line Development Type (gal/FEU/day) (gal/FEU/day) (gal/FEU/day) Ibs/day/FEU Total Cost <br /> 1 User Capacity Requirements 359 696 239 0.299 Low <br /> 4 Unit Capacity Cost - New/Future Facilities $1.02 $0.47 $1,639.29 <br /> 5 Improvement Cost per FEU $366.29 $325.05 $490.47 $1,181.81 <br /> 8 Total Cost per Unit of Development per FEU $947.34 <br /> $947.34 <br /> 9 SDC for example development: 1 Dwelling Unit (FEU) x $947.34 (Total Cost per FEU) = <br /> <br /> 1 User Capacity Requirements 307 597 205 0.256 Low <br /> i $o. oa $0.~ <br /> 4 Unit Capacity Cost - New/Future Facilities $1.02 $0.47 $f, 639.29 <br /> 5 Improvement Cost per FEU $313.96 $278.61 $420.41 $1,012.98 <br /> 8 Total Cost per Unit of Development per FEU $812.01 <br /> $48.720.35 <br /> 9 SDC for example development: 60 Dwelling Units (FEUs) x $812.01 (Total Cost per FEU) = <br /> <br /> 1 User Capacity Requirements 205 398 137 0.171 Low <br /> 4 Unit Capacity Cost- New/Future Facilities $f.02 $0.47 $1,639.29 <br /> 5 Improvement Cost per FEU $209,31 $185.74 $280.27 $675,32 <br /> <br /> ~i I~111 i i ,;, :?~::::: :: :: :::::::: r "'"" i <br /> 8 Total Cost per Unit of Development per FEU $541.34 <br /> <br /> g SDC for example development: 20 Thousand Gross Square Feet (FEUs) x $541.34 (Total Cost per FEU) ~ $10,826.74 <br /> <br /> 1 User Capacity Requirements 1475 2864 g83 4.103 High <br /> 4 Unit Capacity Cost - New/Future Facilities $~.02 $0.47 $1,639.29 <br /> 5 Improvement Cost per FEU $1,507.02 $1,337.33 $6,726.49 $9,570.84 <br /> ($~:: : :~ <br /> 8 Total Cost per Unit of Development per FEU $8,327.77 <br /> <br /> 9 SDC for example development: 4.9 Thousand Gross Square Feet (FEUs) x $8,327.77 (Total Cost per FEU) = $40,806.07 <br /> <br /> 1 User Capacity Requirements 102 199 68 0.085 Low <br /> ~:~, ,, <br /> 4 Unit Capacity Cost - New/Future Facilities $1.02 $0.47 $~,639.29 <br /> 5 Improvement Cost per FEU $104.65 $92.87 $140.14 $337.66 <br /> 8 Total Cost per Unit of Development per FEU $270.67 <br /> <br /> 9 SDC for example development: 190 Thousand Gross Square Feet (FEUs) x $270.67 (To~l Cost per FEU) = $51,427.03 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.