My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4 - PH on MWMC Reg. SDCs
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/14/04Mtg
>
Item 4 - PH on MWMC Reg. SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:03 PM
Creation date
6/10/2004 3:21:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The improvement unit costs (as adjusted for anticipated financing costs and shown in bold in <br />Table 3) are used on line 4 of Table 1. Financing costs are estimated based on the 20-year project <br />list, adjusted for inflation. Projected growth-related capital project costs in excess of available <br />revenues (i.e., improvement fees, interest earnings and existing fund balances) are assumed to <br />be financed with interest accruing at a rate of 5 percent. When financing costs are included, the <br />improvement fee unit costs increase about 10.7 percent, as shown in Table 3. <br /> <br />The unit costs shown in Table 2 and 3 are the result of a comprehensive analysis that <br />determines: 1) growth's capacity needs, and 2) existing and future facility costs needed to meet <br />those needs (i.e., development of the SDC 'Cost Basis'). An example of this analysis is <br />illustrated in the proposed SDC Methodology within Table 2 included in Exhibit A to <br />Attachment A of the AIS for the City Council work session of May 19, 2004 (Agenda page 73). <br />The specific analysis related to these methodological elements used in deriving the proposed <br />SDC rates is summarized below. <br /> <br />Determine Growth Capacity Needs <br /> <br />In order to determine growth-related capacity needs, and how these will be met, Table 4 of this <br />memorandum presents a summary of existing and future improvements capacity. The table <br />shows the capacity requirements of existing users and users associated with new development <br />(growth), along with the percentage of the existing system capacity available to future users and <br />the percentage of the future-improvements capacity that will be associated with growth. The <br />derivation of these numbers is described in detail in the SDC Methodology Appendix C (and <br />summarized in Table C-l). <br /> <br />The numbers in bold in Table 4 are used in Tables 2 and 3 to determine the unit costs of <br />capacity. The italicized numbers in Table 4 form the basis for allocation of existing and future <br />facility costs to growth to develop the cost basis (described below). <br /> <br /> Table 4 <br /> Summary of Growth Capacity Needs by Parameter <br /> Element (a) (b) (c) <br /> Total Future Existing System Future <br /> Improvements <br /> Avera~le Flow <br /> Systemwide Capacity (mgd) 59.3 49.0 10.3 <br /> Existing Users (mgd) 43.8 43.8 0.0 <br /> Growth (m~ld) 15.5 5.2 10.3 <br /> Growth's Capacity Share 26% 10.5% 100% <br /> Peak Flow <br /> Systemwide Capacity (mgd) 277 175 102 <br /> Existing Users (mgd) 264 175 89 <br /> Growth (m~ld) 30 0 30 <br /> Growth's Capacity Share 11% 0.0% 29% <br /> BCD <br /> Systemwide Capacity (mgd) 74,000 66,000 8,000 <br /> Existing Users (mgd) 54,800 54,800 <br /> Growth (mod) 19,200 11,200 8,000 <br /> Growth's Capacity Share 26% 17. 0% 100% <br /> TSS <br /> Systemwide Capacity (mgd) 87,600 71,600 16,000 <br /> Existing Users (mgd) 64,700 64,700 <br /> Growth (m~ld) 22,900 6,900 16,000 <br /> Growth's Capacity Share 26% 9.6% 100% <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.