Laserfiche WebLink
TABLE 6 <br /> <br />Local Wastewater System Development Charge Analysis <br />I1. Analysis of System Value <br />Total Replacement Cost - Pipe $415,212,33(~ <br />Total Replacement Cost - Pumping Stations $15,850,693 <br />City Cost of future proiects within UGB $9,925,332 <br />Other Wastewater Components $3,253,455 <br />1 <br />2. Analysis of Assessable Amount <br />Size Total Cost <br />6-inch $9,434,085 <br />8 to 48-inch $313,928,688 <br /> <br />Ils-CapacityInformationII <br />4. Calculation of Wastewater SDC II <br />Total System Valuation, existing and planned I $444,241,816111 <br />Cost per unit of capacityl~er ~allon ~ I $2.2572 II <br />5. Calculation of Reimbursement Percentage I <br /> City System Capacity (EDUs) in mgd 49.0 100.00% <br /> Existing Use in mgd 21.4 43.7% <br /> Percent Available for New Development in mgd 27.6 56.3% <br /> <br /> Total Value of Reserve Capacity/value of system} $62,122,254 100.00% <br /> <br /> City of Eugene SDC Methodologies Wastewater. <br /> <br /> <br />