My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4 - PH on MWMC Reg. SDCs
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/14/04Mtg
>
Item 4 - PH on MWMC Reg. SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:03 PM
Creation date
6/10/2004 3:21:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Development Charge Methodology <br /> <br /> Introduction <br /> <br /> This document serves as the system development charge (SDC) methodology for the <br /> Metropolitan Wastewater Management Commission (MWMC) Regional Wastewater <br /> System. The MWMC is the regional wastewater treatment agency for the Eugene- <br /> Springfield metropolitan area. System development charges may be collected from all <br /> development that connects to the Regional Wastewater System, including development that <br /> changes the use of existing development, when the change of use results in a greater impact <br /> on the system. <br /> <br /> The methodology contained in this document was developed in accordance with Oregon <br /> SDC legislation (ORS 223.297-223.314), and with the guidance of a Citizen Advisory <br /> Committee (CAC) appointed by MWMC. Table 1 provides a comparison of key <br /> methodological requirements from the Oregon Revised Statute (ORS) to elements of the <br /> MWMC methodology. <br /> <br />TABLE 1 <br />Summary of Key Methodological Requirements <br /> <br /> Oregon Law Requirement MWMC Methodology <br />Reimbursement Fee <br /> <br />Determine that existing capacity exists Explicitly calculates the portion of existing capacity available to <br /> new users based on rated design capacities. <br />Methodology based on, when applicable: Methodology includes: <br />(a) Rate-making principles employed to finance (a) Consideration of capital financing costs <br /> publicly-owned capital improvements (b) Adjustment for grant-funded facilities <br />(b) Prior contributions by existing users (c) Valuation based on appreciated cost (i.e., adjusted for <br />(c) Gift orgrants inflation) <br />(d) Value of unused capacity or cost of existing (d) Determination of unused capacity <br /> facilities <br /> <br />(e) Other relevant factors <br />Promote objective of future system users (1) Includes a credit against SDCs for properties subject to <br />contributing no more than an equitable share of past general obligation bond debt service charges through <br />existing system costs property tax payments. <br /> (2) Provides guidance to calculate a credit against SDCs for <br /> future estimated user charge payments used to fund capital <br /> included on the SDC project list. <br />Improvement Fee <br />Methodology demonstrates consideration of Provides a structured process for allocation of capital project <br />projected costs of capital improvements identified costs that is to be applied to an adopted project li§t <br />in an adopted plan or list <br /> <br /> SEA31003271388(DG).DOC/041040034 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.