Laserfiche WebLink
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />flows. Also, there are facilities such as the dry weather headworks where a portion of their <br />function or design criteria sizing is based on peak flow. <br /> <br />The peak flow management category is allocated entirely to peak flow, as both the ongoing <br />function and the sizing design criteria sizing are based solely on peak flow. <br /> <br />· Peak Flow - 100 percent <br /> <br />Support Facilities (Indirects) <br />The support facilities or indirect category captures certain types of treatment plant facilities <br />that serve multiple functions, such as the laboratory, land acquisition, and instrumentation <br />and control systems. Costs of these types of facilities are allocated across the other <br />11 components in'proportion to the weighted average allocation percentages. For the <br />reimbursement fee, the weighted average reflects the direct allocation of existing asset costs <br />to the 11 facility components. For the improvement fee, the weighted average reflects the <br />allocation of the 20-year project list to the 11 facility components. <br /> <br />· Support facilities allocated proportionally to the other 11 facility components. <br /> <br /> SEA31003271388(DG).DOCT041040034 B-5 <br /> <br /> <br />