Laserfiche WebLink
Staff Report gnd Findings of Compliance with the Metro Plan and statewide <br />Goals and Administrative Rules <br />File LRP 2004-0001 Amendments to the Metro Plan and Public Facil{ties and Services <br />Plan <br /> <br /> Applicant: <br /> City of Springfield on behalf of the Metropolitan WaStewater Management Commission <br /> (MWMC) <br /> <br /> Nature of the ApPlication: <br /> The applicant proposes to amend the Eugene-Springfield Metropolitan Area General <br />· Plan (Metro Plan) and the.Public Facilities and Services Plan (PFSP)~ to (1) more <br /> adequately reflect the impact that new discharge permit restrictions will have had on the <br /> capacity of the regional wastewater treatment system, (2) to clarify the relationship . <br /> between the PFSP project list and locally adopted capital improvement plans, and (3) to <br /> modify (streamline) the administrative and legislative processes that govern the ' <br /> implementation and amendment of the PFSP projects list. <br /> <br /> Background: <br /> MWMC's regional wastewater treatment facilities were designed and constructed in the <br /> late 1970's with a 20-year life expectancy. Slower that expected population growth in the <br /> 1980's extended this life expectancy. In 1996-97 MWMC developed a Master Plan to <br /> evaluate the performance of its facilities, to ascertain areas of constraints within the <br /> existing permit conditions, to identify short-term improvements (e.g. how to address <br /> seismic hazards), and to address other major issues that needed to be studied farther. <br /> In May of 2002 the Oregon Department of Environmental Quality (DEQ) imposed new <br /> and more stringent discharge permit standards on the regional wastewater treatment <br /> facilities, particularly in regard to the treatment of ammonia and thermal loading. As <br /> MWMC staffbegan to evaluate design needs for its wastewater facilities, it became <br /> apparent to them that the existing facilities could not meet the demands imposed by the <br /> new discharge permit restrictions. <br /> Recognizing that a thorough assessment of wastewater collection, treatment and <br /> disposal/reuse needs for the next 20 years was essential, the MWMC began work on the <br /> 2004 Wastewater Facilities Plan, a comprehensive facilities plan update. The objectives <br /> of the 2004 Wastewater Facilities Plan are twofold. First, it is intended to provide for <br /> adequate community growth capacity through 2025, considering policies in the Metro <br /> Plan and current planning assessments for population and development. Second, the 2004 <br /> Wastewater Facilities Plan is intended t° protect community health and safety by <br /> addressing sanitary sewer overflows, river safety, permit compliance and the cost- <br /> effective use of existing facilities and the efficient design of new facilities. <br /> <br /> See appendices A & B' respectfully.. <br /> <br /> StaffKeport and Findings Page 1 1-3 <br /> <br /> <br />