My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File N~mber:. 55999 <br /> Page 10 of 26 Pages <br /> <br /> NOTES: ' - <br /> <br />. 1. E: .ocli monitoring must be conducted accord!nE tO any 9fthe'following te~ procedures as specified in <br /> Standard'Methods for the Examination of Water and Wastewater, 19th Edition, or according to any <br /> test procedure that has been authorized and approved in writing by the Director or his authorized <br /> representative: <br /> <br /> mTEC agar, MF ' Standard Methods, 19th Edition 9-28 9213 D <br /> NA-MUG, MF Standard Methods, 19th Edition 9-63 9222 G <br /> Chromogenic Substrate, MPN Standard Methods, 19th Edition 9-65 9223 B <br /> Colilert QT Idexx Laboratories, Inc. ' <br /> <br /> 2. Beginning no later than July 1 2002, the permittee shall conduct bioassay testing for a period of one (1) year. <br /> in accord.~ce with the frequency specified above. If the bioassay tests show that the effluent, sarriples are <br /> not acutely toxic at the. dilution determined to occur at the Zone of Immediate Dilution and chronically toxic <br />.:. at.the Mix'rog Zone, no further bioassay testing w~ll be.required during this permit cycle..Bioassay results <br /> required w. iththe next NPDES permit renewal application are as follows: At a minimum, quarterly testing <br /> for a..12-m..onth period within the past one: Year, .or the results fi-om four tests performed at:least annually in <br /> the four and one half years prior to the application, using the spedes.listed in Schedule D, · . <br /> <br /> 3. For influent and effluent cyanide sampleS, at least six (6)discrete gra. b samples shall be collected over the <br /> ..- 0perating. day. Each.aliquot shall be not. less than 100 ml and shall be collected and. composited into a larger <br /> container.wfiich has been preserved with sodium hyck. oxide fo.r cyanide samples to protect sample .integrity. <br /> <br /> 4. The pe..rmittee shall perform chemical .analysis. of its influerit, effluent and biosolids to be beneficially used <br /> for the. to .m;' c organic pollutants listed in Tables II ofAppendix D of 40 CFR Part'122 in accordance ~ith the <br /> · . sampling, frequeney in Schedule B. The influent and effluent samples shall be 24-hour dally composites, <br /> except where sampling volatile comlJounds. In this ease, six (6) discrete samples (not less than 100 nfl) <br /> coll.ect.ed, over the operating day are acceptable. The permittee shall take special precautions in compositing <br /> the. '.m,d~v~d. ual..grab samples for the volatile organics to insure sample integrity (i.e.n.o exposure to the <br /> outsme air), .A!temately, the discrete samples collected for volatiles'may be analyzed separately and <br /> averaged. :For biosolids analyses, a grab s~nple fi-om the sludge holding tank overflow shall be used. The <br /> results o.fthe Priority Pollutant Scan analysis s.hall be submitted with'the annual pretreatment report.. <br /> <br /> 5. Daily 24-hour composite samples'shall be analyzed and reported separately. Toxic monitoring results and' <br /> toxics removal efficiency calculations shall be tabulated and submitted with the Pretreatment Program <br /> Annual Keport as required in Schedule E. Submittal of toxic.monitoring results with the monthly Discharge <br /> Monitoring Keport is not required. .. <br /> <br /> 6. Composite samples fi;om the sludge lagoons shall consist of blending equal volumes of grab Samples taken <br /> fi.om the center of 9 or more like-size units resulting fi-om an imaginary grid placed over each lagoon. The <br /> grab samples shall include the entire depth of sludge in the area sampled. Composite samples from the air <br /> drying beds shall consist of blending equal volumes of grab samples taken 'from each air drying bed in use. <br /> Samples shall be representative of the sludge being land applied. <br /> Inorganic poll .utant monitoring must be conducted according to Test Methods for Evaiuatine Solid Waste. <br /> Physical/Chemical Methods, Second Edition (1982) with Updates I and II and third Edition (1986) with <br /> Revision I. <br /> <br /> Fecal Coliform monitoring must be conducted according to Fecal Col~orm, Part 9221 E. or part 9222D., <br /> "standard Methods for the Examination of Water and Wastewater", 18~ Edition, 1992, American public <br /> Health Association, 1015 15~ Street, NW., Washington, DC 20005. <br /> <br /> 7. Calculation of the % volatile solids reduction for the anaerobic digesters is to be based on comparison cfa <br /> representative grab sample of total and volatile solids entering the digestion process and a representative <br /> composite sample of sludge solids exiting the sludge holding tanks. <br /> <br /> 8. The days of digestion shall be calculated by dividing the digester liquid volume by the average daily volume <br /> of sludge production. 4-34 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.