My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number:. 55999 <br /> P.age 20 of 26 Pag~es <br /> <br /> periods of equipment downtime, This condition is not satisfied if adequate backup <br /> equipment should have beeninstalIed in the exercise of reasonable engineering <br /> judgement to prevent a bypass which occurred during normal periods of eqUipment <br /> downtime or preventative maintenance; and <br /> <br /> (c) The permittee submitted notices and requests as required under General Condition <br /> B.3.c. <br /> <br /> (2) .The Director may approve an anticipated bypass, after considering its adverse effects and <br /> any ,ltern,flve.q tn hypa~ln~, whe_n_ the D~_~or dete__m~_J_neg that i_,_ .,~. '.!! mcet-t.he th_we <br /> conditions listed above in General Condition B.3.b.(1). <br /> <br /> c. Notice and request for bypass. · .- <br /> <br /> (1) .Anticipated bypass. If the permittee.knows in advance of-the need-for a bypassi it shail. - <br /> submit prior .written notice, if possible at.least ten days before the date ofthebypass. <br /> <br /> ~ .(2) Unanticipated. bypass. The permitte, shall submit noticei0fan unanticipated bypass as' <br /> required in General Condition D.5. , · - <br /> <br />4. Upset <br /> <br /> a. Definition. "Upset'.' means an.exceptiona! incident in whic.h there is'unint.entional and temporary <br /> · noncompliance with technology based permit effluent limitations b. ecause of factors beyond tho <br /> .reasonable eontrgl of the permittee. An upset does not include noncompliance to the' extent mused <br /> by operation error, imgroperly desi. gned treatment facilities, inadequate treatment facilities, lack of <br /> preventative maintenance, or careless or improper operation. ~ <br /> <br /> · b.' 'Effect of an upset. An upset constitutes an a~rmative defense to an action brought for <br /> noncompliance with such.technology bas~ permit effluent lirrdtatioris if the requirements of <br /> General Condition B.4.c are met. No d~termination made during administrative review of claims <br /> that noncompliance was caused by upset, and before an action for noncompliance, is final <br /> administrative action subject to judicial review. <br /> <br /> c. Conditions. necessar7 for a demonstration of upset. A permittee Who wishes to e.~blish the ' <br /> affirmative defens.e of ups. et shall demonstrate, .thOugh p.roperly signed, con?mporaneous operating <br /> logs, or othir relevant evidence th_at: <br /> <br /> (1} An u~set occurred.and that the permittee can identify the muses(s) of thc upset; <br /> <br /> (2) The permitted facility was at the time being properly operated; <br /> <br /> (3) The permittee submitted notice of the .upset as required in General Condition D.5, hereof <br /> (24-hour notice); and <br /> <br /> (4).. The pe.rmittce complied with an7 remedial measures reqlaired under General Condition A.3 <br /> hereof. <br /> <br /> d. Burden of proof. In any enforcem.ent, proceeding the permitte¢ seeking to establish the occurrence <br /> of an upset has the burden of proof. <br /> <br />5. Treatment of Sinele Operational Event <br /> For purposes of this permit, A Single Operational l~vent which leads to simultaneous violations of more than <br /> one pollutant parameter shall be treated as a single violation. A single operational event is an exceptional <br /> incident which causes simultaneous, unintentional, unknowing (not the result cfa knowing ac.*. or omission),4-44 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.