My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wastewater system that support the housing needs of the Eugene-Springfield <br />· metropolitan area. <br /> <br /> Goal 11 -Public Facilities and Services- To plan and develop a timely, orderly <br /> and efficient arrangement of public facilities and services to serve aS a framework <br /> for urban and rural development. <br /> <br /> OAR Chapter 660, Division 011, implements goal 11. OAR 660-011-0030(1) <br /> requires that the public facility plan identify the general loCation of public <br /> facilities projects. In regard to the Metro Plan, the reference to'Public Facilities <br /> and Services Plan Map 2a in Finding 6 and Policy G.3 in the Proposed <br /> amendments addresses this requirement. In regard to the PFSP, the modification <br /> of the introductory narrative under "Planned Wastewater System Improvements <br /> (Page 28)," the insertion of new Tables 4a and 4b (Page 28), and the modification <br /> of Map 2 and the insertion of new Map 2a, also address this requirement. <br /> <br /> OAR 660-011-0035(1) requires that the public facility plan include a rough cost <br /> estimate for seWer public facility projects identified in the facility plan. In <br /> conformity with this requirement, it is proposed that the PFSP be amended by the <br /> insertion of Table 16a (Inserted following Page 101), which addresses rough cost <br /> ' estimates and a timing estimate for MWMC Wastewater Treatment and <br /> Collection System Improvements. The rough cost estimates in Table 16a are <br /> based on costs set forth in the MWMC 2004 Facilities Plan and Project list. This <br /> v 2004 Plan was the result of an exhaustive study that examined alternatives <br /> ranging from $144M to $233M (See Attachment 3). The preferred alternative, <br /> found in Table 16a, was selected because, among other reasons, it provides the <br /> least expensive means to c°mply with federal requirements and maximizes <br /> MWMC's existing investments. <br /> <br /> OAR 660-011-0045(3) provides that modifications to projects listed within a <br /> public facility plan may be made without amendment to the public facility plan. <br /> This application proposes to add a new chapter to the PFSP regarding <br /> amendments to that plan.-Proposed Chapter VI incorporates the standards for <br /> amending a public facility plan allowed by OAR 660-011-0045(3) and adopts an <br /> amendment process. <br /> <br /> Goal 12 - Transportation <br /> <br /> This goal is not applicable to the proposed amendments. <br /> <br /> Goal 13 - Energy Conservation <br /> <br /> This goal is not applicable to the proposed amendments. <br /> <br /> Goal 14 - Urbanization - To provide for an orderly and efficient transition from <br /> rural to urban land use. <br /> <br /> Staff Report and Findings Page 7 <br /> 7-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.